CMP logo

  • About CMP
  • News
  • Features
  • CMP Regions
    • Amhara
    • Benishangul-Gumuz
    • SNNP
    • Tigray
    • Oromia
  • Resources
    • COVID 19
    • COWASH Documents and Reports
    • COWASH IEC
    • COWASH IV 2021-2025
    • COWASH Research
    • FinnWASH
    • First EWEW
    • MSF and JTR
    • One WASH Ethiopia
    • RWSEP documents
  • Suomeksi
  • Partners
    • Inter Aide
Menu

Abichu gena woreda

COWASH in Abichu gena Woreda and Women Led Water Supply.pdf  (342.2 kB)


  • CMP Implementation Manual (OWNP), December 2014
  • Annexes to CMP Implementation Manual July 2014
  • 486A3068
  • Exhibition
  • Pumping
  • COWASH_woreda_db 27.1.15_a
  • 486A0609 ed
  • 486A0609
  • Proceeding 2007 Water Sector AR Workshop Final
  • Full WIF (unofficial)
  • CLTSH training manual
  • Implementation1
  • MPS1
  • Vcp1
  • Verification_Certification_Protocol_Ethiopia
  • Q2 2007 EFY
  • Q1 2007 EFY
  • marching band
  • Marching band
  • Solid waste
  • Liquid waste
  • 486A4729
  • 486A4564
  • 486A4864
  • COWASH Indicator monitoring plan update
  • Report CR_WSP validation Workshop March 2015
  • COWASH Result Based semi-annual report July-December 2014
  • COWASH output based six-months report July - December 2014
  • Aid Effectiveness of RWSEP and COWASH
  • WASH Secondary baseline in COWASH Woredas
  • Draft RWS O&M Framework 020415
  • Draft RWS O&M Framework 020415
  • RWS O&M Strategic Framework
  • RWS O&M Financial Management
  • RWS O&M Community Based Management
  • RWS O&M Sand Dams
  • RWS &M Hafir Dams and Berkas
  • RWS O&M Hafir Dams and Berkas
  • RWS O&M M&E, MIS and reporting
  • RWS O&M rainwater harvesting
  • RWS O&M spare parts supply and management
  • RWS O&M WQ monitoring and surveillance
  • 486A5900
  • 486A5904
  • COWASH PRESENTATION on 22.4.2015
  • WaterAid Water Quality Policy Guideline
  • WaterAid Ethiopia Water Quality Policy Quideline
  • WaterAid Ethiopia Water Quality Policy Quideline
  • HWTS study in Ethiopia, 2015
  • RADWQ Ethiopia, 2010
  • WaterAid Ethiopia Water Quality Policy Quideline
  • WAE WQP Guideline 2014
  • VFM-WASH Ethiopia report, 2015
  • Water Credit workshop proceedings report-Ethiopia
  • Amhara 2007 Financial Plans
  • BSGR 2007 financial plans
  • BSGR 2007 physical plans
  • BSGR 2007 plan and budget summary
  • BSGR 2007 plan and budget summary
  • Oromia 2007 COWASH plans
  • Final Edited CoWASH 2007 EFY Physical & Financial plans
  • O&M workshop
  • Amhara COWASH 2006 EFY annual finance report
  • COWASH-hankeprofiili
  • COWASH-perustietoja
  • COWASH Amharan osavaltiossa
  • Knowledge Management
  • Private Sector Landscape WASH Ethiopia final 31012015
  • Amhara 2007 EFY Q3 Financial report
  • Amhara 2007 EFY Q3 Performance report
  • Amhara 2007 EFY Q3 Performance report
  • Q1 2007 EFY
  • BSGR 2007 Q3 report part A
  • BSGR 2007 Q3 report part B
  • Oromia 2007 EFY Q3 Performance Report
  • Oromia 2006 EFY performance report
  • Kaivon vartija
  • For Yelibe
  • COWASH kartta
  • COWASH output based nine-months report July 2014-March 2015
  • COWASH output based nine-months report July 2014-March 2015
  • AfricaSan 4 Declaration
  • Draft Situational Analysis for IUSHS
  • Draft IUSHS & SAP 25.2.15
  • Draft final wastewater management strategy, Feb 2015
  • Girma Suominen Sector Collaboration final
  • COWASH PRESENTATION on 10.6.2015
  • Evolution of CMP from 1994 to the 2010s in Ethiopia
  • WASH in Schools in Ethiopia, March 2015, WaterAid
  • OWNP-CWA Reporting Formats and Guideline Final
  • ToR UWASH TC final
  • ToR UWASH TC final
  • Final COWASH MTE Report
  • Final COWASH MTE Report
  • Final COWASH MTE Report
  • Building Adaptive WRM in Ethiopia
  • Private Sector Landscape WASH Ethiopia
  • 486A7320
  • 486A7320
  • English GTP-2 for Water sector, final draft
  • English GTP-2 for Water sector, final draft
  • English GTP-2 for Water sector, final draft
  • English GTP-2 for Water sector, final draft
  • SC presentation 6.7.15pptx
  • Final Report of CMP Training Impacts in Oromia an SNNPR (July 14,2015)
  • Samuel along with a colleague facilitating the discussion
  • Climate Resilient Water Safety Strategic Framework
  • Climate Resilient WSP Guideline for community managed water schemes
  • Climate Resilient WSP Guideline for Urban water utiltities
  • Water Supply Safety Measures, 2004
  • WAE Water Quality Policy Guideline -August 2014
  • National Drinking Water Quality Monitoring and Surveillance Strategy, 2014
  • Sanitation Supply Chain Assessement in Amhara
  • 486A8598
  • 486A8660
  • Oona and Abiy
  • Self Supply News no 9
  • CMP presentation in 38th WEDC conference in July 2015
  • Self-supply week Ethiopia March 2015
  • Self Supply News No 8
  • Effective and Sustainable WASH Services July 2015
  • IMG_2210
  • IMG_2210
  • CWA Project Woredas and small Towns
  • COWASH woredas July 2015, database
  • WASH SIT Assessment Final Report, July 2015
  • Assessing sustainability in an emergency response context, July 2015
  • WASH Climate Resilient Development Strategic Framework
  • Diagnostic Report on S&H Monitoring - Final
  • Ethiopia WASH M&E Diagnostic Report
  • WSWG ToR Endorsed and Revised July 2015
  • Besah Mogesse (2015): Evolution of Community Managed Water Supply Projects (CMP) from 1994 to the 2010s in Ethiopia
  • Case Study of the Ele Spring in Genta Bonke Kebele, Arbaminch Zuria Woreda, Gamogofa Zone, SNNP Region of Ethiopia
  • The Community Managed Project (CMP) approach and potential to promote multiple uses of water
  • Study on the Impacts of CMP Water Supply Projects on the Life of Rural Community in Gonji Kolella Woreda, West Gojjam Zone, Amhara Region-Ethiopia
  • Effective and Sustainable WASH Services: A Case Study of Community Managed Project (CMP) Approach in Ethiopia
  • Report on CMP Research Project (ReCMP) - April 2012 to June 2014
  • Current trends and access to sanitation in Ethiopia
  • Research on AA sanitation and FSM
  • Draft final wastewater management strategy
  • IUSHS draft Strategy 25.2.15
  • Situational Analysis of IUSHS draft
  • Ethiopian Drinking Water Quality Standard 2013
  • Urban Water O&M Manual
  • Urban Water O&M Manual
  • Draft Final OM Strategic Framework _edited_250915
  • Demo maps
  • Demo maps small
  • Abichuna Gnea 2013
  • Abichuna Gnea database
  • 2005 Abichu Gnea
  • 2005 Gumay
  • Gumay database
  • 2005 Jida
  • 2005 Jida
  • Jida monitoring tools v 1-5
  • Jida database
  • 2005 Kersa
  • Kersa database
  • 2005 Nono Benja
  • Nono Benja database
  • 2006 Medebay Zana
  • Medebay Zana database
  • 2006 Seharti Samre
  • Seharti Samre database
  • 2006 Tahtay Maychew
  • Tahtay Maychew
  • Tahtay Maychew database
  • 2005 Arba Minch Zuria
  • Arba Minch Zuria monitoring tools v 1-5
  • Arba Minch Zuria database
  • 2005 Chencha
  • Chencha database
  • 2006 Duna
  • Duna Database
  • 2005 Misha
  • Misha database
  • 2007 Bullen
  • Bullen database
  • 2007 Dibate
  • Dibate database
  • 2007 Mandura
  • Mandura database
  • 2007 Pawe
  • Pawe database
  • Wombera database
  • 2007 Pawe
  • Pawe database
  • 2007 Wombera
  • Wombera database
  • COWASH Component 1 2008 EFY Plan
  • 2006 Chencha
  • Chencha database
  • BSGR 2008 EFY plan
  • COWASH 2007 EFY PERFORMANCE REPORT 091015
  • Summarized Result based report of COWASH, July 2015
  • Carrousel
  • 2006 Abergele
  • Abergele database
  • OpenOfficeCalc
  • Quantum GIS
  • TEMPLATE monitoring tools v 1-5
  • 01 COWASH data collection process v 1-4
  • Process
  • Final Draft Terms Of Reference WRM-SG 20151015
  • Final Draft CR-WSP Training manual
  • Amhara 2008 EFY plan
  • 486A0027
  • 486A9844
  • 486A6196
  • 486A6196
  • Draft Final OM Strategic Framework _edited_250915
  • 2007 Ankasha
  • Logos
  • 2007 Ankasha
  • 2007 Ankasha monitoring tools
  • 2007 Guagusa Shikudad
  • 2007 Guagusa Shikudad monitoring tools v 1-5
  • HSTP Final 2015-10-19
  • OWNP - CWA - FM Manual - July 21 2015
  • 2007 Guagusa Shikudad COWASH-database
  • 2007 Ankasha COWASH-database
  • 2007 Alefa COWASH-database
  • 2007 Chilga COWASH-database
  • 2007 Debark COWASH-database
  • 2007 Dembia COWASH-database
  • 2006 Takusa COWASH-database
  • 2007 Tegede COWASH-database
  • 2007 Chilga
  • 2007 Debark
  • 2007 Dembia
  • 2006 Takusa
  • 486A0558
  • 2007 Borena
  • 2007 Borena COWASH database
  • 2007 Dessie Zuria
  • 2007 Dessie Zuria COWASH-database
  • 2007 Kalu
  • 2007 Kalu COWASH-database
  • 2007 Tenta
  • 2007 Tenta COWASH-database
  • 2007 Abergele
  • 2007 Abergele COWASH database
  • 2007 Sahila Seyemet
  • 2007 Sahila Seyemet COWASH database
  • 2007 Antsokia Gemza
  • 2007 Antsokia Gemza COWASH database
  • 2007 Basona Worana
  • 2007 Basona Worana COWASH database
  • 2007 Artuma Fursi
  • 2007 Artuma Fursi COWASH-database
  • 2007 Dewe Harewa COWASH database
  • 2007 Dawunt
  • 2007 Dawunt COWASH database
  • 2007 Guba Lafto
  • 2007 Guba Lafto COWASH database
  • 2007 Meket COWASH database
  • 2007 Wadla
  • 2007 Wadla COWASH database
  • 2007 Degua Temben
  • 2007 Degua Temben COWASH database
  • 2007 Medebay Zana
  • 2007 Medebay Zana COWASH database
  • 2007 Seharti Samre
  • 2007 Seharti Samre COWASH database
  • 2007 Tahtay Maychew
  • 2007 Tahtay Maychew COWASH database
  • 2006 Bibugn COWASH-database
  • 2006 Dejen
  • 2006 Dejen COWASH-database
  • 2006 Enbise Sar Midir
  • 2006 Enbise Sar Midir COWASH-database
  • 2006 Mirab Este
  • 2006 Mirab Este COWASH-database
  • 2006 Misrak Este
  • 2006 Misrak Este COWASH-database
  • 2006 Bahir Dar Zuria COWASH-database
  • 2006 Dega Damot COWASH-database
  • 2006 Gonjgolola COWASH-database
  • 2006 Quarit COWASH-database
  • 2006 Yilmana Densa
  • 2006 Yilmana Densa COWASH-database
  • Abichu Gnea COWASH-database
  • GUMAY monitoring tools v 1-5
  • 2005 Abichu Gnea COWASH-database
  • 2005 Jida COWASH-database
  • 2005 Kersa COWASH-database
  • 2005 Nono Benja COWASH-database
  • 2005 Gumay COWASH-database
  • 2005 Arba Minch Zuria COWASH-database
  • 2006 Chencha COWASH-database
  • 2006 Duna COWASH-database
  • 2005 Misha COWASH-database
  • 486A1042
  • 486A6190 ed
  • 486A8654 ed
  • 2006 Enarj Enawga COWASH-database
  • 2006 Enarj Enawga COWASH-database
  • 2006 Hulet Ej Enese COWASH-database
  • 2006 Sinan
  • 2006 Sinan COWASH-database
  • 2006 Dera COWASH-database
  • 2006 Farta
  • 2006 Farta COWASH-database
  • 2005 Fogera COWASH-database
  • 207 EFY Performance report of SNNPR
  • ESDP V FINAL
  • SNNP FINAL 2008EFY PLAN of COWaSH December 2015
  • Amhara 2008 EFY Q1 report
  • Amhara 2008 EFY Q1 report
  • Tigray 2008 EFY Q1 Report
  • 40 COWASH woredas Amhara WWW
  • 40 COWASH woredas Amhara WWW
  • 76 COWASH woredas WWW
  • 9 COWASH woredas BG WWW
  • 9 COWASH woredas BG WWW
  • 9 COWASH woredas BG WWW
  • 9 COWASH woredas BG WWW
  • 8 COWASH woredas SNNP WWW
  • 7 COWASH woredas Tigray WWW
  • 12 COWASH woredas Oromia WWW
  • Self Supply News No 10
  • COWASH Q1, 2008 performance report
  • Oromia 2008 EFY Final plan
  • demo_maps_small
  • demo_maps_small
  • demo_maps_small
  • demo_maps_small
  • demo_maps_small
  • demo_maps_small
  • GIS_Bambasi_NWI
  • NWI Bambasi
  • NWI Oda Bilidigilu
  • NWI Agalometi
  • NWI Belo Jegonfoy
  • NWI Degua Temben
  • NWI Nader Adet
  • NWI Tahtay Maychew
  • NWI Medebay Zana
  • NWI Endamehoni
  • NWI Endamehoni
  • NWI Ofla
  • NWI Seharti Samre
  • 2007 Dejen
  • 2007 Dejen COWASH database
  • 2007 Sinan
  • 2007 Sinan COWASH database
  • 2007 Mirab Este
  • 2007 Mirab Este monitoring tools v 1-5
  • 2007 Yilmana Densa
  • 2007 Yilmana Densa COWASH database
  • MSF 7 Program
  • image
  • FinnWASH-BG - Annual Report 2008 - 2009
  • FinnWASH-BG - Annual Report 2009 - 2010
  • FinnWASH-BG - Annual Report 2010 - 2011
  • FinnWASH-BG - Annual Report 2011 - 2012
  • FinnWASH-BG - Annual Report 2012 - 2013
  • FinnWASH-BG - Annual Report 2012 - 2013
  • FinnWASH-BG - Annual Report 2013 - 2014
  • FinnWASH-BG - Annual Report 2013 - 2014
  • FinnWASH-BG - Annual Report 2013 - 2014
  • FinnWASH-BG - Annual Report 2014 - 2015 -final report
  • All FinnWASH databases combined
  • All FinnWASH databases combined
  • Bullen woreda's database
  • Dibate woreda's database
  • Mandura woreda's database
  • Pawe woreda's database
  • Wombera woreda's database
  • Wombera woreda's database
  • Coverage development in whole project area
  • Bullen communal water points
  • Animation-small
  • Bullen medical waste incinerators at health facilities
  • Bullen VIP-latrines at health facilities
  • Bullen water points at health facilities
  • Bullen water points at schools
  • Bullen VIP-latrines at schools
  • Dibate communal water points
  • Dibate water points at health facilities
  • Dibate VIP-latrines at health facilities
  • Dibate medical waste incinerators at health facilities
  • Dibate water points at schools
  • VIP-latrines at schools
  • Mandura communal water points
  • Mandura water points at health facilities
  • Mandura water points at health facilities
  • Mandura VIP-latrines at health facilities
  • Mandura medical waste incinerators at health facilities
  • Mandura water points at schools
  • Mandura VIP-latrines at schools
  • Pawe communal water points
  • Pawe water points at health facilities
  • Pawe water points at health facilities
  • Pawe water points at health facilities
  • Pawe VIP-latrines at health facilities
  • Pawe medical waste incinerators at health facilities
  • Pawe water points at schools
  • Pawe VIP-latrines at schools
  • Wombera communal water points
  • Wombera water points at health facilities
  • Wombera VIP-latrines at health facilities
  • Wombera medical waste incinerators at health facilities
  • Wombera water points at schools
  • Wombera VIP-latrines at schools
  • KML-files of FinnWASH-woredas
  • www-berber bono church wateruser
  • www-galessa leaking pump pipe
  • www-gesengesa pump
  • www-gesengesa boys latrine + rrwh
  • www-senkora shower elementary school
  • www-senkora reservoir
  • ambassador-small
  • embassador and generator-small
  • embassador and generator-small
  • embassador testing-small
  • lots of people2-small
  • ambassador-small
  • raw meat-small
  • all_working
  • reservoir_construction
  • TapioExplains
  • TapioExplains
  • WomberaSparePartStore
  • FinnWASH news 2
  • FinnWASH news 3
  • Gender Training Manual for Trainers (2009)
  • 2007 Endamehoni COWASH database
  • 2007 Endamehoni
  • 2007 Bambasi COWASH database
  • 2007 Bambasi
  • 2007 Isara COWASH database
  • 2007 Isara
  • 2007 Tocha COWASH database
  • 2007 Tocha
  • 2007 COWASH Arba Minch Zuria
  • 2007 Arba Minch Zuria
  • 2007 Chencha COWASH database
  • 2007 Chencha COWASH database
  • 2007 Chencha
  • 2007 Duna COWASH database
  • 2007 Duna
  • 2007 Misha COWASH database
  • 2007 Misha
  • 2007 Arbegona COWASH database
  • 2007 Arbegona
  • 2007 Gorche COWASH database
  • 2007 Abay Chomen COWASH database
  • 2007 Abay Chomen
  • 2007 Gumay COWASH database
  • 2007 Gumay
  • 2007 Kersa COWASH database
  • 2007 Kersa
  • 2007 Nono Benja COWASH database
  • 2007 Nono Benja
  • 2007 Abichu Gnea COWASH database
  • 2007 Abichu Gnea
  • 2007 Jida COWASH database
  • 2007 Jida
  • 2007 Kersana Malima COWASH database
  • 2007 Kersana Malima
  • 2007 Tole COWASH database
  • 2007 Tole
  • 2007 Dirre Inchini COWASH database
  • 2007 Dirre Inchini
  • 2007 Elifata COWASH database
  • 2007 Elifata
  • 2007 Jeldu COWASH database
  • 2007 Jeldu
  • 2007 Nader Adet COWASH database
  • 2007 Ofla COWASH database
  • 2007 Bambasi COWASH database
  • 2007 Bambasi
  • NWI Bullen
  • NWI Dibate
  • NWI Mandura
  • NWI Pawe
  • 2007 Bambasi COWASH database
  • 2007 Bambasi
  • 2007 Bambasi COWASH database
  • 2007 Bambasi
  • NWI Bullen
  • NWI Dibate
  • NWI Mandura
  • NWI Pawe
  • NWI Wombera
  • NWI Pawe
  • CERS_Manual Amharic version_final_030116
  • Env assess and risk screening final-TOOL_140815
  • Evironmental and climate risk assessment ToT manual
  • Env assess and risk screening final-TOOL_140815
  • Env assess and risk screening final-TOOL_140815
  • Evironmental and climate risk assessment ToT manual
  • CERS_Manual Amharic version_final_030116
  • 1 Introduction
  • 2. Water Source and Technologies
  • . Technical O&M requirements
  • 2. Water Sources and Technologies
  • 3. Technical O&M requirements
  • 4. Scheme Management
  • 5. Spare part management
  • 6 M&E and reporting
  • 7. Water Safety Plan
  • 8. Action plan and implementation
  • 1. Introduction
  • 2. Water Sources and Technologies
  • 3. Institutional support for O&M
  • 4. Scheme management
  • 5. Spare part management
  • 6. M&E and reporting
  • 7. Water Safety Plan
  • 8. Action Plan and Implementation
  • Climate and Environmental Risk Screening in water supply, Ethiopia
  • Operation and Maintenance Manual for Urban Water Utilities
  • National Guideline for Urban Water Utilities Tariff Setting
  • National Guideline for Urban Water Utilities Categorization
  • National Guideline for Urban Water Supply & Sewerage Services Organization Setup
  • National Guideline for Technical Service Provision to Customers by Urban Water Supply Utilities
  • Kebele WSP Guideline, 2014 in Amharic
  • Kebele WSP Guideline, 2014
  • KWSP booklet _final
  • 1. KWSP introduction
  • 2. KWSP Team Establishment
  • 3. KWSP Wells and Pumps
  • 4. KWSP Springs
  • 5. KWSP Rural Piped Scheme
  • 6. KWSP Water safety alternatives
  • 7. 6. KWSP Financing
  • GLoWS 2014 Amharic 1
  • GLOWS English 2014
  • WASHCO legalization proclamation for Benishangul-Gumuz
  • BSGR WASHCO Legalization Regulation, Amharic
  • SNNP Regulation 102, 2012
  • SNNP WASHCO legalization directive, Amharic
  • Sample of a certificate
  • Article on WASHCO legalization in SNNP
  • Article on WASHCO legalization in SNNP
  • BSGR WASHCO legalization directive
  • Sample certificate
  • JTR report on WASHCO Legalization
  • Poverty Assesment 214
  • MSF 7 proceedings 21.1.16
  • MSF 7 Long Proceeding (Full Version)
  • One WASH M&E project Inception Report
  • Gender step by step checከlist- Amharic version
  • MSF 7 proceedings, short version
  • MSF 7 proceedings, short version
  • GTP I Achievements and GTP II Plan
  • JTR 9 Findings and Recomendations
  • MSF 7 introduction
  • Progress of MSF 6 Undertakings
  • SDG and SWA progress
  • Summary-MSF 7-S1 WASH Sustainability Stream
  • Summary-MSF 7-S2 Hygiene and Sanitation Stream
  • CMP and WASHCO Legalization
  • CR-WSP in Ethiopia
  • Private Sector in WASH
  • Self supply acceleration
  • Status of Emergency WASH
  • Status of Emergency WASH
  • WASH Sustainability Check in Ethiopia
  • MNCH bottlenecks and opportunities
  • Hygiene and Sanitation JTR report
  • School WASH bottlenecks
  • CSOs WASH Annual Report
  • Monitoring for Safe Water
  • One WASH M&E development
  • Monitoring for Safe Water
  • Proposed MSF 7 Undertakings_Final
  • Module B; Community Based Scheme Managment
  • Module C; Community Based Finacial Managment
  • Module D; Technical O&M Requirements
  • Module E; Spare Part Supply and Management
  • Module E; Spare Part Supply and Management
  • Module F; M&E of O&M systems
  • Module G; Trainers Manual for Rural Water Safety Plan
  • Performance Benchmarking for water utilities
  • WASH M&E and Knowledge Management Undertakings
  • Amhara, CMP Artisan Payment Directive-Final-2
  • Module A - Facilitator's Guide for RWS O&M Traning
  • Module_B_Community Based Managment
  • Module_C_Training Manual on Technical Requirements of O&M
  • Module_D_Community Based Financial Managment
  • Module_E_Training Manual on Spare Part
  • Module_ F_Training Manual on M&E of RWS
  • Module_G_Training Manual on WSP
  • Part_A_Introduction to O&MM
  • Part_B_Decription of Water Sources and Technologies
  • Part_C_Technical O&M requirments
  • Part_D_Community Based Rural Water Supply Schemes Managment
  • Part_E_Rural Water Supply Spare Parts Managment
  • Part_ F_M&E and reporting system update_1
  • Part_G_Water Supply Safety Plan
  • Part_H_Preparation of Action Plan and Implementation of O&M
  • Part_A_Introduction to O&MM
  • Part_B_Decription of Water Sources and Technologies
  • Part_C_Institutional Support Mechanisms
  • Part_D_Rural Water Supply schemes Management
  • Part_E_Rural Water Supply Spare Parts Management
  • Part_ F_M&E and reporting system
  • Part_G_Water Supply Safety Plan
  • Part_H_Preparation of Action Plan and Implementation of O&M
  • Amharic gender step by step checklist
  • Gender in COWASH, manual
  • English gender step by step checklist
  • COWASH Training Impact assesment in Tigray and SNNP, 03.01.14
  • COWASH Training Impact Research in Tigray and Amhara, 26.09.14
  • COWASH Training Impact Assessment in SNNP and Oromia, 14.07.15
  • COWASH Training Impact assesment in Tigray and SNNP, 03.01.14
  • COWASH Training Impact Research in Tigray and Amhara, 26.09.14
  • COWASH Training Impact Assessment in SNNP and Oromia, 14.07.15
  • COWASH 2008 EFY Q2 PERFORMANCE REPORT
  • COWASH 2008 EFY Q2 PERFORMANCE REPORT
  • Supervision report to Amhara, February 2016
  • Supervision report to BGRS, January 2016
  • Supervision report to SNNPR, January 2016
  • Supervision report to Tigray, February 2016
  • Part_A_Introduction
  • Part_B_Water Sources for water supply
  • Part_C_Electro Mechanical Equipment
  • Part_D_Transmission and distribution system
  • Part_E_ Spare Part Supply and Managment
  • Part_F_Equipment and Tools Management
  • Part_E_ Spare Part Supply and Management
  • Part_F_Equipment and Tools Management
  • Part_G_Water Audit, Leakage detection and control
  • Part_H_Asset Management for Water Supply System
  • Part_I_Water Quality Monitoring and Surveillance
  • Part_A_Financial Management
  • Part_B_Community Based Management
  • Part_C_M&E, MIS and Report Requirements
  • Part_D_Human power and capacity building
  • Part_A_Introduction
  • Part_B_Sand and Subsurface Dams
  • Part_C_Hafir Dam and Berkad
  • Part_D_Rainwater harvesting
  • Part_E_Solar Powered Pumping System
  • Part_F_Wind Powered Pumping System
  • Part_E_Solar Powered Pumping System
  • Part_F_Wind Powered Pumping System
  • Part_G_Community Based Management
  • Part_H_Financial Management
  • National Guideline for Technical Service Provision to Customers by Urban Water Supply Utilities
  • National Guideline for Urban Water Supply & Sewerage Services Organization Setup
  • National Guideline for Urban Water Utilities Categorization
  • National Guideline for Urban Water Utilities Tariff Setting
  • Operation and Maintenance Manual for Urban Water Utilities
  • Business Plan Guideline
  • 486A2494 ed
  • 486A2494 ed
  • 486A2558
  • One WASH National Program CWA 2008 1st Q Report Final December 2,2015
  • One WASH National Program CWA 2007 EFY Annual Report Final
  • One WASH National Program CWA 2008 EFY 2st Q Report, March 2016
  • OWNP roll up 1
  • OWNP roll up 2
  • CWA 6 months report in 2008 EFY (2015...2016)
  • Final OM Strategic Framework 130316
  • List of RPS training modules
  • List of RPS training modules
  • Module A - Facilitator's Guide for O&M Traning
  • Module C - Technical Training Manual for RPS
  • Module D. Session-B. Equipment and Tools Management
  • Module D. Session-C. Asset Management
  • Module E. Water Auditing and Leakage Control
  • Module F. Water Quality Monitoring Survelliance
  • Module A - Facilitator's Guide for O&M Traning
  • Module A - Facilitator's Guide for O&M Training
  • Module A - Facilitator's Guide for O&M Training
  • Module C - Technical Training Manual for RPS
  • Module D. Session-B. Equipment and Tools Management
  • Module D. Session-C. Asset Management
  • Module E. Water Auditing and Leakage Control
  • Module F. Water Quality Monitoring Survelliance
  • Module G & H. Technical Training Manual for Pastoral
  • Module A. Session-C. M&E and MIS
  • FINANCING OWNP in ETHIOPIA, 12 March 2016
  • One WASH Dec 2014
  • 2007 Guangua COWASH-database
  • 2007 Zigem COWASH-database
  • IMG_2040
  • 486A2741
  • 486A2801
  • COWASH hankeprofiili Maaliskuu 2016
  • 486A3344
  • 486A3422
  • COWASH database management training guide (OpenOffice Calc)
  • QGIS basics
  • COWASH GIS basics
  • Access and coverage map
  • 2007 Meket
  • 2007 Meket COWASH database
  • 2007 Ofla
  • Self Supply News Vol 12
  • Self Supply Business Catalogue April 2016
  • Module A-Facilitator's Guide for O&M Training
  • Module B-Session A-Introduction to Water Sources and Technologies
  • Module B-Session B-Introduction to Point Sources O&M Management
  • Module C-Technical O&M Requirements
  • Module D-Session D1-Community Based Management
  • Module D-Session D2-Financial Management
  • Module E-Training Manual for spare part management
  • Module F-Monitoring and Evaluation
  • Module G-Water Safety Planning
  • Module H-Implementation of O&M
  • PART A- MODULE D-SESSION B-Equipment and Tools Management
  • PART A-MODULE A-SESSION C- Introduction to RPS Module
  • PART A-MODULE A-SESSION-A&B-Facilitator's Guide
  • PART A-MODULE-B- Description of water sources for water supply
  • PART A-MODULE C-SESSIONS A,B,C,D,E,F,G, Technical O&M requirements
  • Summary of RPS Training Modules
  • PART A-MODULE A-SESSION-A&B-Facilitator's Guide
  • PART A-MODULE A-SESSION C- Introduction to RPS Module
  • PART A-MODULE-B- Description of water sources for water supply
  • PART A-MODULE C-SESSIONS A,B,C,D,E,F,G, Technical O&M requirements
  • PART A-MODULE D-SESSION A-Sparepart Supply Managment
  • PART A-MODULE D-SESSION A-Spare part Supply Management
  • PART A- MODULE D-SESSION B-Equipment and Tools Management
  • PART A-MODULE D-SESSION C-Asset Management
  • PART A-MODULE D-SESSION D-Human Power and Capacity Building
  • PART A-MODULE-E-Water Auditing and Leakage Control
  • PART A-MODULE-F-WQMS
  • PART A-MODULE-E-Water Auditing and Leakage Control
  • PART A-MODULE G & H-Technical Training Module for Pastoral
  • PART B-MODULE A-SESSION A-Community Based RPS Scheme Management
  • PART B-MODULE A-SESSION B-Financial Management for RPS
  • PART B-MODULE A-SESSION C-M&E and MIS Training Module
  • Table of content of all RWS O&M documents
  • Harmonized DSA for donor funded projects
  • Harmonized DSA for donor funded projects
  • Tigray / Degua Tembien District's Baseline report
  • 2007 Kersa COWASH database
  • 2007 Kersa
  • COWASH III Project Document April 2016final
  • CWA 9 months report in 2008 EFY (2015...2016)
  • CWA 9 months report in 2008 EFY (2015...2016)
  • Final 3rd Quarter OWNP CWA Report May 30, 2016
  • 2007 Isara COWASH database
  • 2007 Isara
  • Tigray / Endamehoni District's Baseline report
  • 2007 Gorche
  • Water and O&M MSE Manual 2016 (Amharic)
  • COWASH 2008 EFY Q3 PERFORMANCE REPORT
  • 2007 Endamehoni
  • 2007 Endamehoni COWASH database
  • 2007 Nader Adet
  • 2007 Nader Adet
  • 2007 Nader Adet
  • Tigray / Medebay Zana District's Baseline report
  • Climate and Environmental Risk Screening for COWASH Project-TOT manual
  • Climate and Environmental Risk Screening for COWASH -TOT manual
  • 2007 Gorche
  • 2007 Gorche COWASH database
  • 2007 Gorcge
  • 2007 Gorche COWASH database
  • 486A4366
  • 486A4390
  • 486A4405
  • Tigray / Nadear Adet District's Baseline report
  • GTPII English Translation Final June 21 2016
  • ESDP V FINAL
  • ESDP V FINAL
  • HSTP Final 2015-10-19
  • Self Supply News No 13
  • VFM-WASH Ethiopia report, 2015
  • Ethiopia SIT Final Report July 2015
  • 2007 Ankesha COWASH-database
  • Tigray / Ofla District's Baseline report
  • 2007 Ankesha
  • 2007 Basona Worana COWASH database
  • 2007 Basona Worana
  • 2007 Andabet COWASH database
  • 2007 Kalu COWASH database
  • 2007 Tenta monitoring tools v 1-5
  • 2007 Tenta COWASH database
  • 2007 Kalu
  • 2007 Tenta
  • Tigray / Seharti Samri District's Baseline report
  • Presentations in PDF
  • 2007 Chilga
  • 2007 Chilga monitoring tools v 1-5
  • 2007 Chilga COWASH-database
  • 2007 Antsokia Gemza
  • 2007 Antsokia Gemza monitoring tools v 1-5
  • 2007 Antsokia Gemza COWASH-database
  • 2007 Dawunt
  • Tigray / Tahtai Michew District's Baseline report
  • 2007 Dawunt COWASH database
  • Self Supply News No 14
  • WASHCO Performance and Gender Case Study
  • Comparison of CMP and WMP by Beshah M Behailu
  • Evolution of Community Managed - Water Supply Projects fro 1994 to 2010
  • Tigray / Regional Baseline report
  • Full WIF
  • GTP II Policy Matrix (English) Final _August 2016-2
  • Community Managed RWS in Ethiopia by Linda Annala
  • AnnexIpuitesopimus
  • 20160513+COWASH+III+SIGNED+AGREEMENT
  • Bilateral Agreement COWASH Jan 2014
  • The Signed COWASH agreement Phase I
  • 486A8855
  • 486A8931
  • 486A8903
  • 486A9187
  • 486A9208
  • 486A9120
  • Self Supply News No. 15
  • CR-WSP for RWS Training Manual, Revised, Final, Nov 2016
  • GTP-2 plan main (english) F1
  • COWASH monthly progress report, June 2011
  • Social, Environmental and Climate Risks Screening Guideline
  • COWASH Phase III Completion Report 7.11.2016
  • 486A9739
  • 486A9724
  • 486A9777
  • 486A9594
  • COWASH Quarterly Report July-September 2011
  • 486A9685
  • Borana_Konso(1)
  • Borana_Konso(1)
  • Phase III Launch Report
  • 2009 EGY Q1 Report Annex 3, Federal Financial performance
  • 2009 EFY Q1 Report Annex 2. Risk management monitoring
  • COWASH Quarterly Report July-September 2011
  • 2009 EFY Q 1 Report Annex 1 Federal Plan vs. achievements
  • 2009 EFY Q 1 Report Annex 1 Federal Plan vs. achievements
  • 2009 EY Q1 report, Main text
  • Fied visit report to Basona woreda on Dec 7-8, 2016
  • 486A9901
  • 486A9907
  • 486A0565
  • 486A0565
  • 486A0565
  • COWASH Biannual Report July-December 2011
  • 486A0567
  • 486A0661
  • MoUDH MSE Development Policy & Strategy 280416
  • 2008 Artuma Fursi
  • 2008 Borena
  • 2008 Dawunt
  • 2008 Dawunt
  • 2008 Dawunt
  • 2008 Kalu
  • 2008 Sahila Seyemet
  • 2008 Tenta
  • 2008 Tenta
  • 2008 Wadla
  • Assessment of CMP implementation in high tech, full report
  • 486A1138
  • 486A1076
  • 486A1113
  • Wadla 2008 Database
  • 2008 Database Dawunt
  • 2008 database, Tenta
  • 2008 database, Kalu
  • 2008 database, Borena
  • 2008 database, Artuma Fursi
  • 2008 database, Sahila Seyment
  • Annex 1. COWASH III Result Framework and Performance Monitoring Plan
  • Annex 2. COWASH Federal detailed Phase III budget plan
  • Annex 3. COWASH Phase III detailed Federal level plan
  • Annex 1. COWASH III Result Framework and Performance Monitoring Plan
  • Annex 2. COWASH Federal detailed Phase III budget plan
  • Annex 3. COWASH Phase III detailed Federal level plan
  • Annex 4. COWASH III Federal level staffiing plan
  • Annex 5. COWASH III Federal Technical Assistance Team division of reponsibilities
  • Annex 6. COWASH Phase III Risk Management Monitoring Plan
  • Annex 7. COWASH Phase II Training Standard
  • Annex 8. Federal Training Schedule for 2009 EFY
  • Annex 9. WASHCO's CMP procurement guideline for COWASH Phase III
  • Annex 10. Summary of high tech CMP implementation assessment
  • Annex 11. COWASH III Gender Programming and Action Plan
  • Annex 12. Women Led Micro and Small Enterprise Development Initiative
  • Annex 13. COWASH III Inclusion and Disability Mainstreaming Strategic Plan
  • Annex 14. COWASH III Social, Environmental and Climate Risks Screening Guideline
  • Annex 15. Criteria for Financing Rehabilitation of Water Supplies in COWASH Phase III
  • Annex 16. COWASH Phase III Monitoring Database Development
  • Annex 17 a. Amhara 2009 Plan
  • Annex 17 b. Tigray 2009 Plan
  • Annex 17 c. SNNP 2009 Plan
  • Annex 17 d. Oromia 2009 EFY Pan
  • Annex 17 e. BSGR 2009 Plan
  • Annex 18. Preparedness plan for Ramboll-Niras on COWASH
  • Annex 20. COWASH III Launch Workshop Report
  • Annex 21. Revised COWASH RSU ToR (Feb 2017)
  • Phase III Inception report
  • Phase III Inception report
  • Final One WASH PD August 31 2013
  • 486A1678
  • 0. Day One High level session, PDF
  • 1a. Day One Parallel Session, Climate Change, PDF
  • 1b. Day One Parallel session, Inclusivity, PDF
  • 1c. Day One Parallel Session, One WASH, PDF
  • 1d. Day two Parallel session One, Hygiene, PDF
  • 1e. Day two Parallel session two, Water Quality, PDF
  • 1c. Day One Parallel Session, One WASH, PDF
  • 1d. Day two Parallel session One, Hygiene, PDF
  • 1e. Day two Parallel session two, Water Quality, PDF
  • 1f. Day two Parrallel session Three, SWASH, PDF
  • 2. Day Two, Plenary Morning, PDF
  • 3. Day Two Plenary Afternoon, PDF
  • 3. Day Two Plenary Afternoon, PDF
  • 4. Draft Undertakings of the 8th MSF, PDF
  • 1a. Day One Parallel Session, Climate Change, PDF
  • 2008-30304-Meket
  • 2008-30304-Meket
  • 2008 Meket
  • 2008 Meket Database
  • 2008 Antsokia Gemza
  • 2008 Antsokia Gemza Database
  • 2008 Basona Worana
  • 2008 Basona Worana Database
  • 2008 Guba Lafto
  • Capacity Development Plan for Rural WaSH in Ethiopia
  • 2008 Guba Lafto Database
  • 2008 Dessie Zuria
  • 1a. Day One Parallel Session, Climate Change, PDF
  • 1b. Day One Parallel session, Inclusivity, PDF
  • 486A2202
  • 486A2093
  • 486A2157
  • 486A1104
  • 486A2388
  • MoFED and MoWE Joint Report on CMP
  • 486A2412
  • 486A2245
  • School WASH Mapping
  • Asiat kunnossa
  • 2009 EFY Q1 report, Federal
  • 2009 EFY Q1 report, Federal
  • COWASH 2008 EFY Q3 PERFORMANCE REPORT
  • COWASH Phase III Completion Report 7.11.2016
  • Rural Water Supply Network Forum Report
  • 2009 EFY Q2 Report, Federal
  • Amhara GOF Q1 2009 Finance Report
  • Amhara 2009 EFY Q2 report
  • Oromia 2009 EFY Q2 Report
  • Tigray 2009 EFY Q2 Report
  • BSGR 2009 EFY Q2 Report
  • SNNPR 2009 EFY Q2 Report
  • Compiled 2009 EFY Q1+Q2 Report
  • 2009 EFY Q3 Report
  • 2009 EFY Q3 report
  • Ethiopia's WaSH Sector Stakeholder Analysis
  • 2009 EFY Q3 report
  • Compiled (Federal and Regions) COWASH III 2009 EY Q1+Q2 Performance Report
  • English WASHCO's CMP procurement guideline for COWASH Phase III
  • WASHCO Procurement Guideline, English
  • WASHCO Procurement Guideline, Amharic
  • WASHCO Procurement Guideline, English
  • WASHCO Procurement Guideline, Amharic
  • COWASH WASH Facility Monitoring Rormats
  • COWASH WASH Facility Monitoring Formats
  • WASH facility monitoring formats
  • WSP's CMP Evaluation Report
  • 2007 EFY Planning Templates for Regions
  • CWA POM endorsed
  • 2008 EFY Planning instructions to regions
  • 2008 EFY Report instructions to the regions
  • 2008 EFY Annual CWA Program report
  • 2009 EFY CWA Program Plan
  • CWA Program Financial Manual
  • Oromia 2007 EFY Annual Performance Report
  • Tigray 2009 EFY Q3 Report
  • BG 2009 EFY Q3 Report
  • The old well
  • 486A1469
  • 486A1430
  • Tigray 2009 EFY Q3 report 2nd edition
  • Amhara 2009 EFY Q3 Report
  • Oromia 2009 EFY Q3 Report
  • 486A0071
  • Generic MoU between the CMP Financiers
  • 486A0124
  • Annex 15. Financing COWASH MSE Development
  • Annex 14. COWASH Business Model in MSE Development
  • Annex 13. Sanitation Supply Chain Model
  • Annex 12_List of Tools for SM and WSM Activities
  • Annex 11_Store Design and Bill of Quantity
  • Annex 10. Written Agreement Form
  • Annex 9_Shed Design and Bill of Quantity
  • CMP Communications Strategy
  • Annex 8_Business Plan Formats
  • Annex 7. Risk Assessment and Management Plan
  • Annex 6_Business Model Canvas_Briefing & Format
  • Annex 5. Entrepeneur Capacity Gap Assessment From
  • Annex 4. Planning template for MSE establishment
  • Annex 3_Disability Checklist for Training Attendees
  • Annex 2_Handouts for stakeholders awareness training
  • GUIDELINE
  • Annex 1_Signed Memorandum of Understanding_Scanned Copies
  • Gender Programming
  • Ethiopia Gender Mainstreaming by Lackech Haile
  • Inclusive_WASH_Activities_in_the_Global_South
  • Annex 15. Financing COWASH MSE Development
  • Annex 14. COWASH Business Model in MSE Development
  • Annex 13. Sanitation Supply Chain Model
  • Annex 12_List of Tools for SM and WSM Activities
  • Annex 11_Store Design and Bill of Quantity
  • Annex 10. Written Agreement Form
  • Annex 11_Store Design and Bill of Quantity
  • Annex 10. Written Agreement Form
  • Annex 9_Shed Design and Bill of Quantity
  • Annex 8_Business Plan Formats
  • Annex 7. Risk Assessment and Management Plan
  • Annex 6_Business Model Canvas_Briefing & Format
  • Annex 5. Entrepeneur Capacity Gap Assessment From
  • Annex 4. Planning template for MSE establishment
  • CMP Communications Strategy
  • Annex 3_Disability Checklist for Training Attendees
  • Annex 2_Handouts for stakeholders awareness training
  • Annex 1_Signed Memorandum of Understanding_Scanned Copies
  • GUIDELINE
  • Gender Case Study brochure
  • Gender Case Study on WASHCO Performance Learning Note
  • Training Manual on Gender Planning in WASH
  • 486A1041
  • CR-WSP for RWS Training Manual, Revised, Final, Nov 2016
  • Social, Environmental and Climate Risks Screening Guideline
  • SECRS Training materuials, PDF files
  • Amhara COWASH III regional agreement
  • BGRS COWASH III agreement
  • Oromia COWASH III agreement
  • SNNPR COWASH III agreement
  • CMP Research Project
  • COWASH Phase III Project Document
  • STANDARD OF COWASH TRAININGS
  • WASHCO Procurement Guideline Phase III
  • RPS CMP implementation in Phase III
  • Final 2010 EFY PLANNING TEMPLATES
  • Final COWASH 2010 planning unit cost 270717
  • Data circulation
  • CMP Research Progress Document
  • COWASH Phase III 2009 EFY Federal Level Plan
  • COWASH Federal (FTAT only) 2009 EFY report
  • 2008-71705-Isara
  • 2008-71705-Isara
  • 2008 Isara COWASH database
  • 2008 Isara
  • 2008 Tocha COWASH Database
  • 2008 Tocha
  • 2008 Arbaminch Zuria COWASH Database
  • 2008 Arbaminch Zuria
  • 2008 Chencha COWASH database
  • 2008 Chencha
  • 2008 Duna COWASH Database
  • 2008 Duna
  • 2008 Misha COWASH Database
  • 2008 Misha
  • 2008 Gorche COWASH Database
  • 2008 Gorche
  • 2008 Abay Chomen COWASH Database
  • 2008 Abay Chomen
  • 2008 Kersa COWASH Database
  • 2008 Kersa
  • 2008 Nono Benja COWASH Database
  • 2008 Nono Benja
  • 2008 Abichu Gnea COWASH Database
  • 2008 Abichu Gnea
  • 2008 Jida COWASH Database
  • 2008 Jida
  • 2008 Kersana Malima COWASH Database
  • 2008 Kersana Malima
  • National WaSH M&E Manual (draft)
  • 2008 Tole COWASH Database
  • 2008 Tole
  • 2008 Dirre Inchini COWASH Database
  • 2008 Dirre Inchini
  • 2008 Elifata COWASH Database
  • 2008 Elifata
  • Signed Summary WIF (2013)
  • SNNP 2009 EFY Annual Report
  • Ethiopia's Water Resources Management Policy
  • 110717 Start up meeting minutes
  • TOR for MSPIW (1st Draft, April 20, 2017)
  • Inclusive WASH Activities in the Global South
  • Inclusive WASH Activities in the Global South
  • WaterAid, Gender equality and disability inclusion in WASH
  • Training Manual on Gender Planning in WASH
  • Accessible sanitation from Western Nepal
  • WaterAid equity and inclusion reaching the excluded
  • Ethiopia's Water Sector Strategy
  • WaterAid equity-and-inclusion-framework
  • 150917 Equity & Inclusion sub group meeting minutes
  • GSF-EQND-Study-EN
  • Menageze Rural Piped Water Supply in Dequa Temben Woreda of Tigray Region
  • Full WaSH Implmentation Framework (WIF)
  • Annex 14 and 15, Business Model, Financing
  • CR-WASH Program in Drought-Prone Ethiopia
  • ToR for Translation Service Consultancy
  • ToR for Translation Service Consultancy_Revised_11.10.17
  • Disability inclusion training conducted for COWASH regional stakeholders
  • SNNP RSU Photos
  • SWA Country Engagement Synthesis Report FINAL 091116
  • IUSHS English final
  • IUSHS Amharic final
  • IUSH SAP
  • IUSH SAP
  • IUSH SAP Guidelines
  • CLTSH Implementation Guideline
  • Final SWASH Strategy, Oct 2017
  • Final National School WASH Guideline, Oct 2017
  • School WASH Mapping Revised
  • Final SWASH Strategy, Oct 2017
  • Final National School WASH Guideline, Oct 2017
  • National Social Protection Policy of Ethiopia
  • 568 Proclamation Direction in Amharic
  • Building Proclamation No. 624-2009
  • Proclamation 916-2008, Definition of Powers and Duties of the Executive Organs of the FDRE
  • Right to Employment of Persons With Disability
  • UN Convention on the Rights of Persons with Disabilities
  • 2008-40407 Gumay
  • 2008-40502-Jeldu
  • 2008 Bambasi
  • 2008 Oda Bilidigilu
  • 2008-60305-Bambasi
  • 2008-60305-Bambasi
  • 2008-60306-Oda
  • 2008-60306-Oda Bilidigilu
  • 2008-40407-Gumay
  • 2008-40407 Gumay
  • 2008-40502-Jeldu
  • 2008-70403-Arbegona
  • 2008-70403-Arbegona
  • 2008-10209-Degua Temben
  • 2008 Degua Temben
  • 2008-10207-Nader Adet
  • 2008 Nader Adet
  • 2008-10206-Tahtay Maychew
  • 2008 Tahtay Maychew
  • 2008-10103-Medebay Zana
  • 2008 Medebay Zana
  • 2008-10405-Endamehoni
  • 2008 Endamehoni
  • 2008-10408-Ofla
  • 2008 Ofla
  • 2008-10206-Tahtay Maychew
  • 2008-10206-Tahtay Maychew
  • 2008-10408-Ofla
  • 2008-10408-Ofla
  • 2008-71705-Isara
  • 2008-71705-Isara
  • 2008-71701-Tocha
  • 2008-71701-Tocha
  • 2008-71006-Arba Minch Zuria
  • 2008-71006-Arba Minch Zuria
  • 2008-70201-Misha
  • 2008-70201-Misha
  • 2008-70411-Gorche
  • 2008-70411-Gorche
  • 2008 - Gumay data base
  • 2008-40407 Gumay
  • 2008-40405-Kersa
  • 2008-40405-Kersa
  • 2008-40609-Abichuna Gnea
  • 2008-40609-Abichu Gnea
  • 2008-40615-Jida
  • 2008-40615-Jida
  • 2008-41307-Kersana Malima
  • 2008-41307-Kersana Malima
  • 2008-41308-Tole
  • 2008-41308-Tole
  • 2008-40519-Elifata
  • 2008-40519-Elifata
  • 2008-40405-Kersa
  • 2008-40405-Kersa
  • 2008-40405-Kersa
  • 2008-40502-Jeldu
  • 2008-40502-Jeldu
  • FINAL UWWMS
  • 2008-70201-Misha
  • 2008-40405-Kersa
  • 2008-41308-Tole
  • 2008-60404-Agalometi
  • 2008-2008 Agalometi
  • 2008-60207_Bulen
  • 2008-2008 Bulen
  • 2008-40401-Nono Benja
  • 2008-40401-Nono Benja
  • 2008-40509-Dirre Inchini
  • 2008-40509-Dirre Inchini
  • 2008-41905-Abay Chomen
  • 2008-41905-Abay Chomen
  • 2008-40407-Gumay
  • 2008-40407 Gumay
  • 2008-71705-Isara
  • 2008-71705-Isara
  • 2008-71701-Tocha
  • 2008-71701-Tocha
  • 2008-71006-Arba Minch Zuria
  • 2008-71006-Arba Minch Zuria
  • 2008-71007-Chencha
  • 2008-71007-Chencha
  • 2008-70207-Duna
  • 2008-70207-Duna
  • 2008-70201-Misha
  • 2008-70201-Misha
  • 2008-70403-Arbegona
  • 2008-70403-Arbegona
  • 2008-70411-Gorche
  • 2008-70411-Gorche
  • 2008-10209-Degua Temben
  • 2008 Degua Temben
  • 2008-10207-Nader Adet
  • 2008 Nader Adet
  • 2008-10103-Medebay Zana
  • 2008 Medebay Zana
  • 2008-10405-Endamehoni
  • 2008 Endamehoni
  • 2008-10408-Ofla
  • 2008-10408-Ofla
  • 2008-10206-Tahtay Maychew
  • 2008-10206-Tahtay Maychew
  • Training Report _Business Model Canvas
  • DSC_0013
  • Dr Mulatu Takele
  • DSC_0063
  • Training Report _Gender and Leadership
  • WRM JTR docs distributed in Dec 2017
  • Executive summary of AWRM in Ethiopia
  • PROCLAMATION NO 92, 1994
  • Regulation 162, 2009 Irrigation Development Investment Incentives
  • REGULATION NO, 115, 2005
  • Regulation 151, 2008 Abay Basin
  • Regulation 156, 2008 Awash_Basin
  • Regulation 253, 2011 Rift Valley Lakes Basin
  • Water Governance Capacity of AWASH Basin, 2015
  • IMERU TAMRAT presentation on 2008
  • Proclamation 197, 2000 on Water Resource Management
  • Ethiopian Water Resource Management Policy
  • Water Sector Strategy
  • Gender, chidren and disability in water policy
  • Gender, children and disability in water policy
  • Abbay Basin Booklet, 2016
  • AWASH Basin economic effects and policy, 2016
  • Draft Water Partnership Agreement, Awash Basin
  • Implementation of IWRM in Awash River Basin, 2016
  • The Water of Awash Basin, a future challenge, ILRI, No date
  • Assessment of Water Governance Capacity, Awash Basin, 2013
  • Wetlands Assessment in ABA, 2013
  • Current Ecological Scenario of some Rift Valley Lakes, 2016
  • Threats and Opportunities to Major Rift Valley Lakes Wetland, 2017
  • Abay Basin Documents
  • Detail activity and financial plan of flood and drought
  • 7-3-2017Final Integrated watershed strategic plan-28_05_2017
  • ABIMCS Strategic Plan July 02_2017
  • Flood and drought management SBP 03 July 2017 PRINT
  • Main report final June 2017.
  • Stakeholders Management Strategic Plan June 2017
  • Water Allocation_Strategic plan _june_2017
  • Water Quality Strategic Basin Plan Final - Copy
  • LIVES_wp_15
  • LIVES_wp_19
  • LIVES_wp_irrigation institutions
  • Book of Abstract-01092017
  • ppt on Lake Tana
  • ODI Thirsty Future
  • BCBT Learning Note
  • CRGE Strategy PPT
  • Ethiopia Water Footprint
  • Vietnam Hydro-Economic Framework
  • Ethiopia´s River Basin Map
  • COWASH BL Final report 290118
  • Annex 3. COWASH III BASELINE QUESTIONNAIRE, ENGLISH, FINAL
  • WQMS&R Guideline, June 2017
  • Try and Buy, Ppilot HWTS in Ethiopia, Jan 2018
  • Recommendations to develop a sustainable HWTS supply chain in Ethiopia
  • DSC_0089
  • COWASH BL Final report 290118
  • Annex 3. COWASH III BASELINE QUESTIONNAIRE, ENGLISH, FINAL
  • Proclamation 534,2007 on river-basin-councils
  • Jan 25, 2018 meeting presentations
  • 01. O&M Strategic Framework
  • 02. RWS Point Source Manual, Parts A, B, C D, Technology and Management
  • 03. RWS Point Source Manual, Parts E,F,G,,H, SPs, Monitoring, WSP, Planning
  • 11. Business Plan Guideline for RPS
  • 08. RPS manual, Parts L,M, M&E, MIS, Capacity building
  • 07. RPS manual, parts J,K, Financial and Community Based Management
  • 06. RPS manual Parts F,G, H,I, Equipment, Tools Management, Leakage, Assets, WQ
  • 05. RPS manual, Parts D and E, Distribution systems and SPs
  • 04. RPS Parts A,B,C, Water sources and EM equipment
  • 10. Pastoral manual, Parts E,F,G,H, Solar & Wind Energy, Community and Financial Management
  • 09. Pastoral manual, Parts A,B,C,D, Sand and Haffir Dams, RWH
  • Main contents of RWS O&M manuals No (02...10)
  • Main contents of RWS O&M manuals No (02...10)
  • River Water Pollution Status and Water Policy Scenario
  • Map of Rift Valley Watersheds
  • Hydrological assessment and characterization of Lake Ziway
  • Rift Valley Lake Basin Map
  • Fluoride and Fluorosis in Central Rift Valley
  • Heavy Metals Concentration in Effluents of Textile Industry in Hawassa
  • Heavy metals blending on treatability of wastewaters
  • Groundwater Management for Irrigation in the Raya and Kobo
  • Heavy metals blending on treatability of wastewaters
  • Heavy Metals Concentration in Effluents of Textile Industry in Hawassa
  • Fluoride and Fluorosis in Central Rift Valley
  • Dr Geremew preentation on water charge
  • Dr Geremew presentation on waste water charge
  • Revised 2009 EFY compiled annual report
  • Amharic Version Annex 15, Financing COWASH MSE development
  • Amharic Version Annex 14, COWASH Business Model in MSE Development
  • Amharic Version Annex 14, COWASH Business Model in MSE Development
  • Amharic Version Annex 13, Sanitation Supply Chain Model
  • Amharic Version Annex 12, List of Tools & Start up Materials
  • Amharic Version Annex 11, Partially translated to Amharic_BOQ for SPS
  • Amharic Version Annex 10, Written Agreement Form
  • Amharic Version Annex 9, Shed Design with BoQ
  • Amharic Version Annex 8, Preparing a Business Plan_Adopted from Amhara TVET
  • Amharic Version Annex 7, Risk Assessment and Management Plan
  • Amharic Version Annex 6, Business Model Canvas Outline
  • Amharic Version Annex 5, Enterprenuers Capacity Gap Assessment Form
  • Amharic Version Annex 4, Planning Template for MSE Establishment
  • Amharic Version Annex 3, Disability Checklist for Training Attendees
  • Amharic Version Annex 2, Documents on COWASH Phase III Highlight_NSMG_NH&EH
  • Amharic Version Annex 1, MoU of Amhara Regional State
  • Amharic Version Guideline for Women-led MSEs Dev't in COWASH
  • Miltoo 15 MISOOMA IMX COWASH Faayinaans Gochu
  • Miltoo 14 Goosa daldaala COWASH MIsooma IMX Dubbartootan Hogganamani
  • Miltoo 13 Hidhata Modeela Dhiyyessa Saaniiteshinii
  • Miltoo 12
  • Miltoo 11
  • Tigray region / Degua Tembien district's baseline report
  • Miltoo 10 Gucca Waligaltee Barrefamaa
  • Miltoo 9
  • Miltoo 8
  • Miltoo 7 Hoggansaa fi qoorannaa Qoormaata (Karoora xiiqqessu Samuda)
  • Miltoo 6 Ibsa fi formaatiiwwan
  • Miltoo 6 Ibsa fi formaatiiwwan
  • Miltoo 5 Gucca Qoranoo Hanqina Dandeetii Intarpireenaraa
  • Miltoo 4 Qajojii Karoora Aanaa Hundeeffama IMX f(1)
  • Miltoo 3
  • Miltoo 2
  • Tigray / Regional baseline report
  • Miltoo 1
  • Dhiheessa Bishaani (Final as per comment)
  • Irrigation Development Road Map_Executive Summary_Amh
  • National Smallholder Irrigation and Drainage Strategy_DRAFT
  • National Smallholder Irrigation and Drainage Strategy_DRAFT
  • National Smallholder Irrigation and Drainage Strategy_DRAFT
  • Hyacinth expansion in Lake Tana
  • Use of Water Hyacinth in Sustainable Fashion
  • Converting Water Hyacinth to Briquettes
  • Tigray / Endamehoni district's baseline report
  • Water hyacinth control
  • Loosing the hyacinth fight
  • Problem overview of hyacinth in Lake Tana
  • E&I Injebara training report
  • Transition from Emergency to Development Support
  • Guidelines for Emergency Water Trucking
  • Guidelines for Emergency Water Trucking
  • PoUWT Options in WASH Emergency
  • Tigray / Medebay Zana district's baseline report
  • COWASH Brochure, Feb 2018
  • CMP guideline
  • Final Audit Report COWASH 26.9.2017
  • 171117 TA mitigation plan
  • 291217 Mitigation Plan on General issues
  • Tigray / Nadear Adet district's baseline report
  • 20171102 BGRS Audit Mitigation plan
  • 20171112 SNNPR Audit mitigation plan
  • 151117 Oromia Audit mitigation plan
  • 20171227 Amhara Audit Mitigation Plan
  • Federal COWASH Team Admin Manual Annexes
  • COWASH Federal Admin Manual v11
  • Supervision report to Amhara, February 2016
  • Report on Supportive Supervison _Tigray-2017
  • Tigray / Ofla district's baseline report
  • Revised COWASH RSU ToR (Feb 2017)
  • 261217 FM Workshop outcomes
  • rollovermoney from 2008 EFY
  • 260118 FM Checklist-Draft 3
  • Internal Audit Guideline-Draft1
  • COWASH cost data, March 2018
  • COWASH Communications Guidiline Final
  • Tigray / Seharti Samri district's baseline report
  • Community level disability inclusion Guidebook_220318
  • Capacity building in the inclusion of persons with disabilities in COWASH
  • OWNP Phase I Review Report Final March , 2018
  • 2008-60203_Wombera
  • 2008-60203_Wombera
  • 2008-60404-Agalometi
  • 2008-60404-Agalometi
  • 2008-60207_Bulen
  • Tigray / Tahtai Michew district's baseline report
  • 2008-60207_Bulen
  • WWD celebration- 22 March 2018
  • Kebede Gerba
  • Kebede Gerba
  • WASHCO Hand-Book
  • Training Guideline on Women's Leadership in WASHCO_Final_041218
  • Awash_RBA
  • COWASH quarterly report July-September 2011
  • ConflictResolution
  • DrTena_Water Resource Management Issues and Challenges in Ethiopia
  • Institutional and Human Capacity
  • WaterQuality1
  • WaterQuality
  • Irrigation for Growth
  • WaterCharge&SchemeSustainability
  • Photos Group 1
  • Photos Group 3
  • Photos Group 3
  • COWASH biannual report July-December 2011
  • Photos Group 2
  • Photos Group 1
  • Abay Basin_Part1_Pdf
  • Abay_Basin_Part2
  • Groundwaterlegislation
  • WRM JTR-process and expected outcome
  • RiftValley_RBA
  • Walking the talk- Disability story at SNNPR- April 2018
  • Walking the talk- Disability story at SNNPR- April 2018
  • COWASH strives for financial transparency and accountability- April 2018
  • COWASH strives for financial transparency and accountability- April 2018
  • FTAT 9-months report in pdf
  • Groundwater Legislation & Regulatory Provision
  • Tigrigna COWASH disability inclusion guideline
  • Amharic COWASH Community level disability inclusion Guidebook
  • MHM Policy and Implementation Guide to Ethiopia
  • May 24 First Draft Phase 2 Program Document-clean version 1
  • Toilet Chair
  • Drought Areas WS Program Doc 04 May 2018 Clean version
  • Drought Areas WS Program Doc 04 May 2018 Clean version
  • H&EH Status in Ethiopia and future Direction-3 final MSF
  • MSF 8 undertakings WASH JTR June 8,2018
  • MSF Presentation _Dr. Seleshi
  • OWNP Phase I Review Report 6.11.18
  • WRM - JTR Findings and Recomondations June 12-13 2018 TA ver 2
  • Tematic streme WASH
  • Tematic Streme WRM ppt
  • Thematic Stream HEH
  • One WASH Review and Phase II Plan
  • DR Seifu Kebede
  • COWASH WaterAID Inclusive WASH Experience
  • CC and GTP II
  • Resourcing WASH
  • Capacity Building in WRM
  • Capacity Building in WRM
  • NIWRMP
  • Transformational Agenda for Irrigation
  • Water charge and use in AWASH basin
  • Water charge, sustainability and legislation
  • WRM JTR and NWRMP outline
  • Climate change and health
  • Drinking water quality
  • Health Facility WASH
  • HEH Status and future Directions
  • Micro planning
  • Sanitation Marketing
  • Sanitation Safety Plan
  • SM business development
  • Urban hygiene and sanitation
  • Vulnerability Assessment of Health
  • Drought Areas WS Program Doc, May 4, 2018
  • OWNP phase I review document
  • Draft_Program May 8, 2018
  • Key Notes from Speekers
  • Drought Areas WS Program Doc, May 4, 2018
  • OWNP phase I review document, June, 2018
  • Road map for the training cascading
  • Module_E_Session E9_Roadmap
  • Module_E_Session E9_Business Plan for RPS
  • Module_D_Session_5_Action and Budget Plan for O&M
  • Module_D_Session_4_M&E
  • Module_D_Session_3b_Community Scheme Financial Management
  • Module_D_Session_3aCommunity Scheme Management
  • Module_D_Session_2b_Technical O&M
  • Module_D_ Session _2a_Description of Point Water Sources and Technologies
  • Module_C_Strategic Framework
  • Module_B_Orientation on organization of the manuals
  • Module_A2_Facilitation Guide
  • Module_A1_Introduction to the training workshop
  • Module_E_Session E9_Roadmap
  • Module_E_Session E9_Business Plan for RPS
  • Module_E_Session E8_Pastoral Areas WSS
  • Module_E_Session E7_Human_Power
  • Module_E_Session E6_Asset Management for RPS
  • Module_E_Session E4_Spare Part Supply and Management
  • Module_E_Session E2b_Financial Management for RPS
  • Module_E_Session E3_Technical O&M Requirments for RPS
  • Module_E_Session E3_Technical O&M Requirments for RPS
  • Module_E_Session E2b_Financial Management for RPS
  • Module_E_Session E2a_Scheme Management for RPS
  • Module_E_Session E1_Introduction_description_Technology of RPS
  • Feyera Kebede- Personal story
  • Mohammed-Nur- Personal Story
  • COWASH Mid term Meeting- 7 May 2018 (1)
  • Training Guideline on Women's Leadership in WASHCO management, English
  • Training Guideline on Women's Leadership in WASHCO Management, Afaan Oromo
  • Training Guideline on Women's Leadership in WASHCO management, English
  • Training Guideline on Women's Leadership in WASHCO Management, Afaan Oromo
  • COWASH Phase III MTE report, Final
  • Tigrigna, Final Training Guideline on Women's Leadership in WASHCO Mgt
  • Champion of Resilience-Guade Story-Final- 26 June 2018
  • Gonji Kolella Case Study Report
  • Gult-5 Water Point
  • Gonji Kolella Case Study Report
  • Case study of the Ele gravity scheme in Genta Bonke Kebele, SNNPR
  • COWASH in Abichu gena Woreda and Women Led Water Supply
  • Capacity development plan for rural WaSH in Ethiopia (draft)
  • Reaching the most vulnerable group of people
  • Menageze Rural Piped Water Supply in Dequa Temben Woreda of Tigray Region
  • Healing the Scars
  • The Leader
  • Water and Job
  • A case in balance
  • Feyera Kebede- Personal story
  • Mohammed-Nur- Personal Story
  • Yeloma Kebele
  • The Steward
  • Ministry of Finance and Economic Development and Ministry of Water and Energy joint report on CMP
  • Zegemesk Spring Development
  • COWASH Mid term Meeting- 7 May 2018 (1)
  • Champion of Resilience-Guade Story-Final- 26 June 2018
  • COWASH story on MSE- Basona Woreda- April 2018
  • July 26, Second Draft Phase 2 OWNP Program Document
  • National Hygiene and Environmental Health Communication-guideline Final Document
  • A case in balance
  • Abichu Gena Woreda and Women Led Water Supply
  • Champion of Resilience-Guadie Story
  • COWASH Mid Term Review 2018
  • Feyera Kebede- Personal story
  • Mohammed-Nur- Personal Story
  • Training Guideline on Women's Leadership in WASHCO Management, Amharic
  • Ethiopia's WaSH sector stakeholder analysis
  • Training Guideline on Women's Leadership in WASHCO Management, Afaan Oromo
  • Field visit to Debark and Dembia woredas
  • Debark and Dembia Woredas disability inclusive water point, July 2018
  • Antsokia disability inclusion best practice in RPS scheme
  • Antsokia disability inclusion best practice in RPS scheme
  • Brochure on Women's Empowerment in WASH
  • Brochure on Women's Empowerment in WASH
  • Water and Sanitation Program's CMP evaluation report
  • Brochure on Women's Empowerment in WASH
  • Gender achievements in COWASH III
  • Disability Inclusion achievements in COWASH III
  • Training in Mombasa
  • Community level disability inclusion Guidebook_AFAN OROMO
  • OWNP baseline report, Jan 2017
  • Proceeding (long) Final MSF 9
  • Short proceedings Final
  • Finnish Water Way
  • SNNPR COWASH 2009 EFY Annual Performance Report
  • SNNP REGIONAL STATE 2010 Annual report Final
  • SNNP REGIONAL STATE 2010 Annual report Final
  • Tigray / Degua Tembien district's baseline report
  • Amaric version for construction of ferro- cement tank
  • Amharic bid document for afridev handpump procurement
  • Amharic CDF Projects Cost Estimate Guideline
  • Water points site selection guidline
  • Amharic water point site selection guide
  • English version of CDF project cost estimating guideline
  • English version of O&MM procedure of water points
  • Minister Alemayehu Tegenu's interview
  • Gravity flow water supply
  • Final training manual on hand pumps procurment for Woreda experts
  • RAIN WATER ROOF CATCHMENT SYSTEM
  • Revised quality control training
  • RWSEP RWS Designs Compilation Completion Report 1994
  • Training manual to artisans in Tendring & related issues
  • Water points site selection guidline
  • Woreda Experts training in construction tendring & related matters for 2001EFY
  • RWSEP Phase I Completion Report
  • RWSEP Phase II Completion Report
  • RWSEP Phase III Completion Report
  • RWSEP Phase IV Completion Report
  • RWSEP KAP Study 2006
  • RWSEP Phase II Mid-Tern Review Report
  • RWSEP Human Rights Report 2005
  • Guidelines for Donor Disengagement and Programme Support Withdrawal (1999
  • CDF Guideline for institutions (3.11.06)
  • Revised English CDF Guidelines-2006; (3.11.06)
  • RWSEP Phase III Mid Term Review Report
  • Minister Alemayehu Tegenu's interview
  • OWNP 2008 EFY ANNUAL REPORT
  • OWNP 2009EFY Annual Report_27March
  • Manual 5 Hygiene
  • Manual 4 Use and Maintenance of Urine Diverting (Composting) Dry Toilets
  • Manual 3 The Use of Urine as Fertilizer
  • Manual 2 Composting
  • Manual 1 Ecological Sanitation
  • Manual 1 Ecological Sanitation
  • Poster Use-and-Maintain
  • Sep 22, 2018, Phase-II OWNP Development and Action Plan
  • Marjaana and Gezahegn
  • Marjaana and Gezahegn
  • School WASH Manual Draft Final 041018
  • A Guide to School WASH Facilities Management Draft Final
  • CMP communications strategy
  • Guideline for Women led MSE Development in COWASH Phase III in Tigrigna
  • Training Guideline on Women's Leadership in WASHCO Management, Tigrigna
  • Brochure on Women's Empowerment in WASH, Tigrigna version
  • Community Level Disability Inclusion Guidebook_Tigrigna
  • Nebar Keshmando Kebele story
  • Nebar Keshmando Kebele story
  • Amesti 4 water point 131118
  • CMP fund management guideline
  • NWI2 guide_5July18 (1)
  • Final NWI2 Kick - off workshop 7 Dec 2018 Final
  • Drinking-water-quality-ethiopia-ESS-2016
  • NIWRMP DRAFT REPORT
  • Kaisa Kuismanen MSc Paper on solar
  • Agenda and registration
  • Generic Memorandum of Understanding between the CMP financiers
  • Handouts
  • Other materials
  • Overall contents
  • Sessions 1-12
  • Published Articel on Drought by Getachew Alem
  • WP5_Hydropower_Aquaculture_Recreation_Final Report
  • WP4_Wastewater_Final Report
  • WP3_ Water Supply_Final Report
  • National WaSH M&E manual (draft)
  • WP2_Irrigation_Final_report
  • WP1_Social_Water Charge Final Report
  • WP1_Legal_Inst_Final Report
  • WP1_Econ_Final report
  • National Guideline
  • Main Report
  • Resettlement Policy Framework final ducument
  • Final Disclosable Environment and Social Management Framework
  • Ethiopia's water resources management policy
  • CRWSP and SECRSM Review workshop report final
  • CRWSP and SECRSM Review workshop report final
  • 20190121 MoFEC DSA rate
  • Trainer's fee directive
  • COWASH Brochure_Final
  • MINCH_Leaflet_2019
  • Ethiopia's water sector strategy
  • Etiopian vesisektori Helmikuu 2019
  • OpenWASH Count me in
  • Vacancy_Country Director_Max Foundation Ethiopia FINAL
  • Using water with saving
  • Commission of the Status of Women, draft agreed conclusions
  • Save Water - Secure Future
  • Karjalainen 22.2.2019 (1)
  • Karjalainen 22.2.2019 (2)
  • 53544454_414239756002491_3985106712926355456_n
  • OWNP Phase II Final Version 2019
  • Kurkkuun pesiytyvä juotikas tappoi nautoja hitaasti ja tuskallisesti
  • Gender Inclusive WASH strategic plan Sept 2018
  • WWD2019_factsheet
  • Amhara 2009 EFY Annual report
  • Amhara 2010 EFY Finance Report
  • CR WASH - Emergency Development Nexus 22Mar2019
  • Last wake-up call presentation Arto Suominen FINAL
  • Microplans for WWD
  • Updated Ethiopia OWNP II Document, March 21, 2019
  • Ethiopia's full WaSH Implementation Framework (draft)
  • WSS sector development and challenges
  • WWD presentation monitoring and maintenance
  • MoFED and MoWE Joint Report on CMP
  • WB_WSP CDF Evaluation Final
  • E& I WaterAid 27.03.19
  • Highlights on the NWI 2 & MIS status
  • MoE-SWASH
  • MSF-Undertakings Progress
  • Summary of the WaSH Implementation Framework (WIF)
  • OWNP Phase II Document CWA phase II status March 28
  • WDC_ppt
  • WSP experience in WASH SG on 29.3.2019
  • WSWG ppt on monitoring and maintenance
  • COWASH III 2010 EFY Annual Performance Report
  • COWASH III 2010 EFY Annual Performance Report
  • SWA Sector Ministers' meeting Agenda
  • Ethiopia - Leave no-one behind progress
  • Over 50 ministers to agree on decisive actions to end inequalities in access to water and sanitation
  • Ethiopia Country Brief-2019
  • 5 ways to understand why inequalities persist and how to push for change
  • Connecting the Dots on Accountability and Leaving No One Behind
  • Disability integration in Woredas_05 April 2019
  • Disability integration in Woredas_05 April 2019
  • Mobilising finance for WASH
  • 2019 SMM DAY 2 closing remarks
  • Learning Alliance Facilitator April 2019
  • Audit Blog_08 April 2019_Final
  • OpenWASH Count me in
  • Capacity building in the inclusion of persons with disabilities in COWASH
  • COWAH Community level disability inclusion Guidebook_Afaan Oromo
  • COWASH Community level disability inclusion Guidebook_AMHARIC
  • COWASH Community Level Disability Inclusion Guidebook_Tigrigna
  • COWASH Community level disability inclusion Guidebook_English
  • Tigrigna COWASH disability inclusion guideline_110518
  • E&I Injebara training report
  • Disability inclusion training conducted for COWASH regional stakeholders
  • Presentation on Disability Mainstreaming Training in COWASH
  • AMCOW gender mainstreaming policy and strategy
  • NBI Gender Mainstreaming Policy and Strategy
  • Gender Mainstreaming in WASH Ethiopia Overview, 2014
  • COWASH Gender Case Study
  • Preliminary Gender Profile of Ethiopia 2014
  • CMP woredas
  • Women Empowerment in COWASH, 2019
  • COWASH training guidelines on Women Leadership in WASHCO Management
  • 081217 Gender and Disability Inclusion meeting
  • 300119 Task Force Minutes
  • Special Needs- Inclusive Education Strategy, Ethiopia
  • Ethiopia´s Presentation_Financing
  • Reorganizing financing water and sanitation for all in 2030
  • World Bank WSP CDF Evaluation 2010
  • CMP woredas
  • MoFED and MoWE Joint Report of CDF, 2010
  • IRC report on CMP in Yilmana Densa
  • Story of Bertukan Asmamaw
  • CMP Manual
  • WASHCO Procurement Guideline 2019
  • CMP woredas
  • CMP implementation Guideline for High Tech Water Supply
  • Assessment of CMP implementation in high tech, full report
  • Experience of shallow drilled wells using CMP approach
  • CMP Implementation Manual in CWA, March 2019
  • Life of Rural Community in Gonji Kolella
  • Ele Spring in Genta Bonke
  • Abichu Gena Woreda and Women Led Water Supply
  • Gult-5 Water Point
  • CMP woredas
  • Menageze RPS in Dequa Temben
  • Zegemesk Spring Development
  • Amesti 4 water point 131118
  • In Search of water
  • Nebar Keshmando Kebele story
  • The Leader
  • Arajana Primary school in Duna Woreda
  • Visit to Duna Woreda in 2018
  • Amora Wanza No 2 Water Scheme
  • The farmer story
  • Addis Alem Water Scheme
  • WASHCO Hand-Book
  • Story from Fogera Woreda, Amhara Region
  • Story from Dejen Woreda of Amhara Region
  • Story from Guagusha Shikudad Woreda of Amhara Region
  • Equality-non-discrimination-and-inclusion-in-wash-a-toolkit
  • Female-friendly-public-and-community-toilets-a-guide
  • Introduction to the CMP research project
  • Quide to equitable WSP
  • slides-to-support-equity-integration in WSP
  • COWASH in Abichu Gnea Woreda_Blog
  • COWASH in Abichu Gnea Woreda_Blog
  • ANRS Rural Water Supply Schemes Maintenance
  • Briefing on Rural Water supply O&M of Ethiopia
  • O&M of RWS in Uganda
  • Solutions for Rural Water Supply Maintenance
  • CMP research project progress report
  • EWEW Draft Agenda
  • EWEW Budget Breakdown
  • EWEW_Concept Note
  • Beyond-the-SMM-suggestions-for-follow-up-actions-V1
  • Yohannes strory from Chencha
  • EWEW_Symposium_DraftAgenda_May_22_2019
  • CMP research project
  • EWEW Draft Agenda_May 05 2019
  • Research and Policy Advisor_IRC Ethiopia_May 2019
  • MHM Day_COWASH Statement_28 May 2019
  • Brochure on Women Empowerment Afan Oromo Final
  • Brochure on women empowerment Tigrigna Final
  • Brochure on Women Empowerment Amharic Final
  • Brochure on Women Empowerment in COWASH, English Final
  • CMP research project progress update
  • EWEW-EXHIBITION BOOKING AGREEMENT 29 MAY
  • EWEW-Side Event Pcakge and Agreement 29 MAY
  • MHM Policy and Implementation Guide to Ethiopia
  • ODF_Campaign_2024_ Document_MoWIE (280519
  • Ethiopian Standard 6345- 2018 Disposable pad
  • Ethiopian Standard 6346- 2018 Reusable pad
  • Expanding Access to MHM Products in Ethiopia, PSI
  • Expanding Access to MHM Products in Ethiopia, PSI
  • Lowland WASH MHM Assessment in South Omo
  • Menstrual Health Landscape in Ethiopia, FSG
  • Menstruation matters (UNICEF)
  • MHM Consumer Journey (PSI)
  • MHM Products supply chain and busines review. UNICEF
  • MHM study on school girls, SNV
  • MHM supply chain powerpoint UNICEF
  • Mapping the knowledge and understanding of MH
  • MHM flyer general
  • CMP fund management guideline
  • FCHVs and Menstruation, RWSSP-WN
  • Menstruation and adult women, RWSSP-WN
  • MHM Position Paper, RWSSP-WN
  • Students and Menstruation, RWSSP-WN
  • Teachers and Menstruation, RWSSP-WN
  • MHM training manual, WSSCC
  • MHM training guide WaterAid
  • Annex A - Water point application
  • MHM the basics WaterAid
  • Menstrual hygiene materials WaterAid
  • Disabling Menstrual Barriers, WaterAid
  • MHM agenda in schools, UNICEF
  • Proceedings of the 5th Annual Virtual Conference on MHM, UNICEF
  • Safepad User-instructions
  • Safepad towards SDGs
  • Introducing Safepad
  • Annex B - Follow-up
  • Quide to equitable WSP, WHO
  • Slides to support equity integration in WSP, WHO
  • WHO Guideline for WSP Audit
  • WSP Audit Training Report 2019, Ethiopia
  • Audit training PowerPoint 2019 Ethiopia
  • WSP Presentation of Arbaminch
  • CR-WSP update Ethiopia
  • Annex E - Field appraisal form
  • Lessons learned in COWASH CR-WSP
  • WSP lessons learned in Ethiopia, WHO, 2016
  • WSP manual
  • Hazard identification in watershed
  • Watershed_Management Principles
  • Watershed_Management_Concept
  • WASH KAP Baseline Survey Report (130917), UNICEF
  • Assessment of knowledge and practice of MHM high school girls in Western Ethiopia
  • Annex F - Aknowledgement receipt
  • Detailed proceedings of Ethiopia-Uganda learning on O and M
  • Summary proceedings of Ethiopia-Uganda learning on O and M
  • Health Policy of Ethiopia 1993
  • Education and training policy, Ethiopia, 1994
  • Hygiene and EH strategy
  • Hygiene and Environmental Health Strategy 2016
  • Integrated USH SAP, 2017
  • Integrated USH Strategy 2017
  • Water sector policy, Ethiopia, 2001
  • Annex A - Water point application
  • Water sector strategy, Ethiopia, 2001
  • SWASH Strategy, Oct 2017
  • National Social Protection Policy of Ethiopia
  • UNICEF Guidance on menstrual health and hygiene
  • UNICEF Guide to menstrual hygiene materials
  • Event Program June 6, 2019
  • Ensuring No One Is Left Behind, Research 2019
  • Asenteiden muuttaja Aino Himanen
  • EWEW-EXHIBITION BOOKING AGREEMENT 29 MAY
  • Annex B - Follow-up
  • New Floor Plan
  • Exhibitor Manual
  • Gender equality and disability inclusion in WASH, WaterAid
  • Inclusive Conference Guide
  • Asenteiden muuttaja Aino Himanen
  • Addis_Uni_Borehole_Conference_Agenda
  • Annex E - Field appraisal form
  • JTR 10 inclusion subgroup executive summary FINAL
  • Addis_Ababa_Infrastructure_1360x765
  • Energy Sector Overview and Reform Direction
  • Ethiopia Water Resources and Basins
  • Irrigation Development in Ethiopia
  • Annex F - Acknowledgement receipt
  • Transboundary strategies
  • WRDM Strategy Integration with SDGs
  • WASH Sector Panel Discussion
  • Introduction and cross cutting, Bekele
  • 2.4. Energy Resource Mix in Ethiopia - Current Status and Future Direction (17.06.2019)
  • 2.3. Water and Energy Week_Wind Energy Opportunities and Emerging (18 June 2019)
  • 2.2 Prospects of Geothermal Energy in Ethiopia (June 2019) MESERET (R))
  • 2.1 Electricity Sector of Ethiopia
  • 1.4 PIANA Enel Green Power_final
  • Annex G - Approval form
  • 1.1 Crogate_WB_NEP_EWEW
  • 2.3 Bubbler_Addis_Ababa_Short_Presntation
  • 2.2 Water Based Growth Corridor June2019
  • 2.1EYIP EWEW-
  • 1.3 The Unmodern part of the modern SSI development
  • 1.2 Smallholder irrigation development EWW
  • 1.1 Ethiopian Major Irrigation Projects_EWEW Presention_Michael MM
  • 4. GERD_PPO
  • 3.EWRCA Presentation on Water and Energy Week
  • Annex H - Funding agreement
  • 2.Ethiopian Water Works Ass_Gethune .
  • 1.Water and Energy Week - 10-12 June 2019_ERG_Hilawe
  • 5 Experience and Contribution of Professional Associations june 18 2019
  • 4 Experience & Contributions of ESEE Rev.
  • 3 Water and energy research1
  • 2 Engage- For Leap Change
  • 1 Water and Energy Symposium
  • 2.4_Manaye_Model Water Utility _UNICEF_WaterAiD
  • Annex J - General conditions annex II of the funding agreement
  • 2.3_Geremew_s_Piped Supply at Premise
  • 2.2_MoWIE_OWNP I Lessons and OWNP II Key Features(Updated)
  • 2.1_Dr Beshah_Historical Per_160619
  • 1.4_Integrated urban Sanitation WB UNICEF22
  • 1.3_Asherfedin_CLTSH and ODF_MoWIE__June_15edited
  • 1.2_Dr. Negash_ODF _ Presentation_ Negash
  • 1.1_EWEW_WaSH_Presentation_Tesfaye_K
  • 2.3 TK_EWEW__GW_ Resources_Tesfaye_k
  • 2.2 Potential groundwater exploration sites for large scale development
  • Annex L - Roles and responsibilities of a WASHCO
  • 2.1 GWP Presentation1 EWEW
  • 1.3 NIWRM Dr. Adanech & Dr. Tena
  • 1.2 Monitoring and Information system of Hydrology EWEW 18 June 2019revised111
  • 1.1 Clim_Info_forecast_Water_day_Jun_2019_final_V_short
  • IDDP_Mozambique1
  • Existing and Planned Map of Power System 1
  • 2.2 EWEW - Biogas Technology in Ethiopia
  • 1.4.EWEW Presention on operationa challenges on curreent power sector
  • 1.3. Tariff-Theory-Practice-Ethiopia-18062019
  • Annex M - Construction monitoring report
  • 1.2. Getahun Energy Efficviency in the Ethiopian Context III (1)
  • 1.1 SG Presentation - Overall Status of implementation of the Strategic Plan and the Action Plan - 03June2019 (1)
  • 6 Irrigation Financing 19 June 19
  • 5 Irrigation_MIS_EWEW_17-20 June 2019
  • 4 Tena+Mekonnen - Performance and Sustainability of Irrigation Schemes in Ethiopia 11062019
  • 3 Global experience in water use association, Lessens for Ethiopia
  • 2 Institutional issues and irrigation water management - 19 June 2019 - Fitsum Hagos
  • 1 Irrigation Institution Practices and Challenges
  • Annex P - Financial report for woreda WaSH team
  • 2.4 Sustainable & Affordable Financing
  • 2.3 Solar Power Driven Rural Water Supply Systems Implementation, Practices and Challenges of WVE
  • 2.2 Financing Through Soft Loans
  • 1.3 School WASH Overview
  • 2.1 CSOs Investment in the WASH Sector
  • 1.3 School WASH Overview
  • 1.2_COWASH takeaways
  • 1.1_Capacity Building Contribution
  • 04_WaSH Takeaway
  • Annex R - Progress report format for financial institution
  • 03_Water Resources Basin Takeaway
  • 02_Irrigration Takeaway
  • 01 Energy Takeaway
  • call for actions - final
  • Programme
  • Disability awareness raising, Dr Abebe and Melaku Teklu
  • Gender Equity and Disability Inclusion in OWNP II, Lakech
  • Annex W - Micro-finance institution & BoFED agreement
  • Inclusive WASH for persons with disabilities, WaterAid
  • Equity and Disability Inclusion Workshop Report
  • Ethiopian OWNP-CWA - POM Second Draft June 3,2019
  • COWASH III Final Performance Audit Report 310519
  • COWASH III Final Performance Audit Report 310519
  • Marjaana Pekkola opening in Equity and Disability Inclusion event May 14, 2019
  • Annex V - Training synopses A-F
  • SNNPR DI supportive supervision report_29_March_2019
  • Oromia DI supportive supervision report_19_April_2019
  • Tigray DI supportive supervision report_16_May_2019
  • Amhara DI supportive supervision report_24_June_2019
  • How to turn setbacks in to Comebacks, COWASH Female Artisan 150719
  • A day in the life of community during CMP implementation, 140719
  • Annex X - Duties and responsibilitie of various actors
  • Artisans in COWASH, 140719
  • Private sector involvement in COWASH_The case of Artisans, 140719
  • Story of Basona Warena Woreda in CMP development, 140719
  • MHM Assessment COWASH (110719)
  • MHM Assessment COWASH (110719)
  • Annex Z - Institutional latrine application
  • MHM Assessment COWASH (110719)
  • MHM photo
  • National School WASH Guideline Nov 2017
  • SWaSH Strategy, Nov 2017
  • FMoH_2017 Onsite Household Latrine Technology Option Planning and Construction Manual
  • Fouth Edition of drinking water guidelines, WHO
  • The handbook of water information systems, 2018
  • Annex ZA 1 - Daily community labor contribution recording
  • COWASH Phase III Federal part report (2009-2011)
  • 0 Draft MSF -10 Plan
  • MSF Budget_Draft
  • Likainen vesi levittaa tappavia tauteja, Jan 2007
  • Tehokkaalla tiedotuksella vahva omistajuus, Olli Moilanen June 2007
  • Vesihankkeiden kestavyys, May 2004
  • Annex ZA 2 - Daily community material contribution recording
  • Vesihanke auttaa koyhimpia auttamaan itse itseaan, Eija hietanen, 2006
  • CDF Article on July 22, 2004 for WEDC
  • Contact women strategy
  • Marketing Safewater Systems
  • Performance-based funding for reliable rural water services
  • The handbook of water information systems, 2018
  • Annex ZB 2 - Community material contribution summary
  • Health Development Army in Ethiopia
  • Women Development Army strategy implementation
  • Strengthening the business case for water, sanitation and hygiene - how to measure value for your business
  • OWNP -CWA POM Final Draft Aug 21 2019 Abiy
  • Financing Strategy
  • Annex ZD - Budget release request by WASHCOs
  • Conceptual paper for communication strategy
  • Final Sector Review Report
  • Press releases of MSF 1
  • Opening remarks and key notes
  • MSF 1 agenda and program
  • Annex ZE - Variation assessment report form
  • EUWI MSF participants list
  • Policy and regulation session
  • Planning, Implementation and coordination
  • Financing
  • Group works introduction
  • EUWI MSF session 6 - Discussion and Response on Communicatio
  • Annex ZF - Variation approval from the woreda WaSH team
  • EUWI MSF session 6 - Discussion and Response on Private Sect
  • EUWI MSF session 6 - private sector participation study
  • EUWI MSF session 6- Communication Stakeholder Analysis
  • EUWI MSF session 6 - Ethiopia Ground Water Assessment Projec
  • EUWI MSF session 8 - remarks on UAP
  • Closing
  • EUWI MSF session 6 - Donors Assistance Group on Water
  • Annex ZG - Project supervision report form during construction
  • MSF Aid Memoire
  • WASH-MSF 2 Statement
  • Evaluation report on the MSF 1 undertakings
  • Final Sector Review Report (JTR 1)
  • Evaluation report on the MSF 1 undertakings
  • Annex ZH 1 - Quarterly summary of project application status
  • May 2008 JTR and Agreed Actions (JTR 2)
  • TOR for the 3rd JTR Mission
  • JTR 4 Final Report (Oct 2009)
  • MSF 3 Review of Undertakings
  • MSF-3 Agenda and Presentations
  • Opening and Key note speeches
  • Annex ZF - Variation approval from the woreda WaSH team
  • MSF-3 Statement and Proceedings
  • MSF-3 Statement, Undertakings and Proceedings
  • Opening
  • Exhibitions materials
  • Annex ZH 3 - Quarterly summary of water point's budget utilization
  • Documents related to Undertakings
  • TVET issues
  • Universal Access Plan II
  • WASH Implementation Framework
  • WASH MoU related papers
  • Annex ZI - Physical and financial plan annexes to funding agreement
  • Other presentations
  • JTR-5 presentation
  • Closing and undertakings
  • JTR-5
  • JTR-5
  • Annex ZH 3 - Quarterly summary of water point's budget utilization
  • MSF 5 Preparatory documents
  • Opening, press release, program
  • Presentations
  • Proceedings and action plan
  • MSF 5 Undertakins
  • Annex ZI - Physical and financial plan annexes to funding agreement
  • JTR 6 Final
  • JTR 7 final
  • Keynote speeches
  • Presentation of progress of MSF 5 undertakings
  • MSF 6 Program, final
  • One WASH M&E
  • Annex ZI - Physical and financial plan annexes to funding agreement
  • Finance and coordination
  • 4th Annual CSO WaSH Report
  • Sustainability
  • H&S in One WASH
  • Undertakings
  • Annex ZK - More on CMP funds and flow of funds
  • MSF 6 proceedings and final program
  • News
  • JTR 8 for MSF 6
  • MSF 7 proceedings
  • Annex ZL - Format for project completion report
  • MSF 7 Undertakings and Action Plan
  • JTR 9 reports for MSF 7
  • MSF 8 keynote speeches
  • Achieving MSF 7 Undertakings
  • Achieving MSF 7 Undertakings
  • Generic Memorandum of Understanding between CMP financiers
  • MSF 8 theme presentations
  • 1a. Day One Parallel Session, Climate Change, PDF
  • 1b. Day One Parallel session, Inclusivity, PDF
  • 1c. Day One Parallel Session, One WASH, PDF
  • 1c. Day One Parallel Session, One WASH, PDF
  • 1c. Day One Parallel Session, One WASH, PDF
  • 1d. Day two Parallel session One, Hygiene, PDF
  • 1e. Day two Parallel session two, Water Quality, PDF
  • 1f. Day two Parrallel session Three, SWASH, PDF
  • 2. Day Two, Plenary Morning, PDF
  • 3. Day Two Plenary Afternoon, PDF
  • Achieving MSF 7 Undertakings
  • Financing the SDGs
  • Briefing on OWNP and CWA evolvement
  • MSF 8 proceedings
  • MSF 8 Undertakings and undertaking action plans
  • MSF-8 Program
  • JTR 10 reports
  • Key Notes from Speeches and press releases
  • MSF 9 program
  • First plenary presentations
  • Day Two Plenary presentations
  • Universal Access Plan (UAP) - Executive summary
  • One WASH Review and Phase II Plan
  • COWASH WaterAID Inclusive WASH Experience
  • Climate resilience
  • WRM presentations
  • HEH presentations in PDF
  • Drought Areas WS Program Doc, May 4, 2018
  • OWNP phase I review document, June, 2018
  • Rural water supply Universal Access Plan (UAP)
  • Proceeding (long) Final MSF 9
  • Undertakings and action plan
  • JTR -11 Report presentation
  • Suomen tuki Etiopian vesisektorille tayttaa 25 vuotta (5)
  • COWASH I-III two pager (8)
  • COWASH I-III_suomeksi
  • Urban water supply Universal Access Plan (UAP III)
  • COWASH I-III Suomi Final
  • National WASH finacing working group meeting minute1
  • Financing the SDGs, Samuel Godfrey, 2017
  • 25 years of Finnish support 081119
  • COWASH I-III results Nov 2019
  • COWASH I-III Suomi Final
  • Rural water supply Universal Access Plan (UAP I)
  • COWASH I-III Suomi Final
  • ETHIOPIA WASH SECTOR COUNTRY BRIEF
  • Integrating CR with WASH by Abiy Girma
  • MSF evolution
  • Guide to equitable WSP
  • CR-WSP, Managing health risks associated with climate variability and change
  • GLOBAL STATUS REPORT ON WATER SAFETY PLANS
  • Urban sanitation Universal Access Plan (UAP IV)
  • Strengthening O and M through WSP
  • Roadmap to WSP resources
  • Guidelines for drinking water quality
  • WSP Manual
  • WSP manual for small communty water supplies
  • WSP field guide for small water supplies
  • slides-to-support-equity-integration in WSP
  • wsp-training-pack-spot-hazardous events
  • wsp-training-pack-module 11, Revise the plan
  • National hygiene and sanitation strategic action plan (SAP Part II))
  • wsp-training-pack-module 10, Periodic reviews
  • wsp-training-pack-module 9, Develop supporting programs
  • wsp-training-pack-module 8, Prepare management procedures
  • wsp-training-pack-module 7, Verify effectiveness
  • wsp-training-pack-module 6, Define control measures
  • wsp-training-pack-module 5, Develop improvement plan
  • wsp-training-pack-module 4, Determine control measures
  • wsp-training-pack-module 3, Identify hazards
  • wsp-training-pack-module 2, Describe the WS system
  • wsp-training-pack-module 1, Assemble the team
  • National hygiene & sanitation strategic action plan, part II (SAP II)
  • wsp-training-pack-module 0, Overview
  • Participant-workbook
  • Facilitator handbook
  • ODF Campaign Framework, Final
  • ODF Campaign flyer 1
  • 271119 MSF 10 WASH Undertakings, Final
  • CR-WASH AND Equity
  • Urban sanitation Universal Access Plan (UAP IV)
  • CR-WSP, Final
  • Equity and Inclusion final
  • Institutional Capacity Building, Final
  • Quality In WaSH final
  • Sanitation Marketing Final
  • Sustainability Final
  • WASH Financing - Equity Final
  • WASH Financing, Final
  • WASH Marketing Final
  • WASH - Takeaways - MSF 10
  • National hygiene & sanitation strategic action plan (UAP II)
  • MSF evolution and MSF 9 Undertakings progress, final
  • JTR-12, Summary of Mission Report MSF 10_Final
  • Global Monitoring Tools Final
  • ODF Presentation
  • WSS Strategic Plan_Draft_English
  • Modern Irrigated Development through Educated Youth Program
  • Lake Beseka Water use (1)
  • Policy and legal Processes for Payment for Ecosystem Services
  • National hygiene and sanitation strategy for Ethiopia
  • Strategic pillars of BDA and NIWRMP
  • Sustainable Water Hyacinth Management Strategy
  • Water based Growth Corridor Approach for Irrigation Development
  • Water productivity as Valuing water in Small Scale Irrigation
  • WRM-Takeaways-MSF 10 Final
  • MSF 10 program final
  • MSF 10 Photos
  • Ethiopian water resources management policy
  • Sanitation Safety Planning Manual
  • Practical guide to auditing WSPs
  • WSP audit training materials
  • 6-training-slides
  • Strengthening O and M through WSP
  • 20200106_122359
  • Second CMP Doctor (3)
  • Ethiopian water sector strategy
  • CMP finanace & property management
  • CMP funding agreement bn.WASHCO & WWT
  • CMP projects application preparation
  • Pre & post test questions for CMP trainings
  • Presentation of General issues on CMP
  • Presentation on CMP appraisal & approval
  • Memorandum of Understanding (MoU) on integrated implementation of WaSH program (draft)
  • Presentation on CMP procurement and contracting
  • Presentation on CMP procurement and contracting
  • Presentation on Roles and Responsibilities in CMP
  • WASHCOs recording & reporting in CMP
  • CMP finanace & property management
  • CMP funding agreement bn.WASHCO & WWT
  • CMP projects application preparation
  • Pre & post test questions for CMP trainings
  • Presentation of General issues on CMP
  • Ethiopian WaSH M&E manual (draft)
  • Presentation on CMP appraisal & approval
  • Presentation on CMP procurement and contracting
  • Presentation on Roles and Responsibilities in CMP
  • WASHCOs recording & reporting in CMP
  • CMP finanace & property management
  • Pre-Test Questions for WASHCO CMP Management ToT
  • Inclusive hand dug well design in COWASH III_Final
  • COWASH web database manual
  • Artisans training manual in water schemes construction
  • Tigray Disability inclusion review workshop July 10, 2019
  • SNNPR DI supportive supervision report March 29, 2019
  • Oromia DI supportive supervision report April 19, 2019
  • Tigray DI supportive supervision report May 16, 2019
  • Amhara DI supportive supervision report June 24, 2019
  • Amhara DI supportive supervision report November 29, 2019
  • COWASH Disability Inclusion presentation
  • Disability presentations
  • Kavin Etiopiassa, Juha Itkonen
  • Kavin Etiopiassa, Juha Itkonen
  • Kilpajuoksu Afrikkaan, Kari Huhta
  • Suomen tuki Etiopian vesisektorille tayttaa 25 vuotta (5)
  • Summarized MSF 10 proceedings - 150220
  • Full MSF 10 Proceedings - 150220
  • Full MSF 10 Proceedings 160220
  • Summarized MSF 10 Proceedings 190220
  • Full MSF 10 Proceedings 260220
  • Summarized MSF 10 Proceedings 260220
  • Full MSF 10 Proceedings 260220
  • Summarized MSF 10 Proceedings 260220
  • Full MSF 10 Proceedings
  • COWASH III compiled annual report 2009-2011 EFY
  • CMP1 draft learning note template CD example john
  • CMP Development Story in Basona Warena Woreda, Arto
  • CMP scaling up story in general
  • CMP scaling up story in Amhara by Yimer 290419
  • CMP development and what CMP is
  • Shnkurt Medeb Spring Development in Basona Woreda
  • CMP modality of sustainability by Arto Suominen March 21, 2020
  • Community Procurement, Lesson learnt 060219
  • COWASH Contribution to the WASH sector developmenr
  • COWASH CR-WSP
  • COWASH Disability_Lessons learnt with photos_09 Feb 2019_Final john
  • CMP woredas
  • Gender Case Study on WASHCO Performance Learning Note, COWASH
  • Impacting on women in COWASH
  • Time saved by women and girls in COWASH
  • Brief on COWASH guidelines and manuals_280120
  • COWASH Perfomance Monitoring Learning note 091119
  • Case Story_Bambasi Woreda_MK_11.06.19
  • CMP woredas
  • Lessons learned in MSE development
  • Rural Water Supply O&M manual brief summary_221119
  • Story of Aino_March 8
  • Story of Bertukan Asmamaw
  • Feyera Kebede- Personal story
  • Mohammed-Nur- Personal Story
  • Walk with an international auditor, Taavi Leinikka
  • Yohannes strory from Chencha
  • CMP woredas
  • Female artisan in Arbaminch Zuria Woreda
  • Private sector development in Arbaminch Zuria Woreda
  • Private sector development in COWASH
  • Brief on adapting CMP approcah in schools _91219
  • COWASH school WASH story
  • Lesson on SECRSM implementation Dec 19, 2018
  • CMP woredas
  • WASHCO files story
  • WASHCO legalization status in COWASH regions
  • Brief on COWASH support to woredas _170220
  • 25 years of Finnish support 081119
  • COWASH I-III Suomi Final
  • COWASH I-III two pager (8)
  • CMP woredas
  • COWASH in Abichu Gnea Woreda_Blog
  • Story from Dejen Woreda of Amhara Region
  • Story from Fogera Woreda, Amhara Region
  • Story from Guagusha Shikudad Woreda of Amhara Region
  • Case Story of Spare Part Supply Enterprise In Basona Worana
  • WASH facility Assessment checklist for Covid-19
  • CMP woredas
  • COVID-19 and persons with psychosocial disabilities
  • COVID-19_response_considerations_for_people_with_disabilities_190320
  • WHO disability considerations in covid 19
  • covid broshour back
  • covid broshour front
  • people with symptoms poster
  • prevention method poster
  • symptoms
  • Toll free line
  • who-rights-roles-respon-hw-covid-19
  • Nutrition services in COVID-19 Response
  • Guide_to_Local_Production of handrub
  • WHO disability considerations in covid 19
  • Global Humanitarian Response Plan COVID-19
  • WASH facility Assessment checklist for Covid-19
  • WASH Cluster Partners for Covid-19 Preparedness (03)
  • Universal Access Plan mass mobilization strategy
  • Water Sanitation Hygiene and Waste Management - COVID-19 v1.1
  • Oromia DI supportive supervision report_February_2020_updated
  • COVID 19 Handbook for health professionals FMOH 2020
  • Clean your hands 17.4
  • COVID-19 Prevention and Control in Schools 17.4
  • WashEm Handwashing with soap 17.4
  • COWASH inception phase report
  • 1.sif-spring-source-d
  • 2.tfs-spring-source-d
  • 3.mas-spring-source-d
  • 3.mas-dug-well-hand-pump-d
  • 2.tfs-dug-well-hand-pump-d
  • 1.sif-dug-well-hand-pump-d
  • National drinking water quality monitoring and surveillance strategy
  • 3.mas-household-practices-d
  • 2.tfs-household-practices-d
  • 1-sif-household-practices-d-19032020
  • Spring protection O&M Guideline
  • BG DI supportive supervision report_February_2020
  • Tigray DI supportive supervision report_December_2019
  • Frontieri Insights
  • Building adaptive WRM in Ethiopia
  • Governance and Drivers of Change in Ethiopia’s Water Supply Sector
  • Ethiopia, Strategic Framework for Managed Groundwater Development
  • Water institutions in the Awash basin of Ethiopia
  • Ethiopian water sector development program vol 2
  • Ethiopian water sector development program vol 1
  • Ethiopia Demographic and Health survey 2011
  • Ethiopia Demographic Health Survey 2000
  • Ethiopia Demographic Health Survey 2016
  • Ethiopia Demographic Health Survey 2016, Key Indicators
  • Ethiopia Mini Demographic and Health Survey 2019
  • Ethiopia country report 2015
  • COWASH COVID News
  • COWASH News on COVID Support
  • Antsokia Gemza Woreda in Amhara already started the COWASH III COVID
  • Vesisektori Etiopiassa
  • COVID 19 Handbook for health professionals FMOH 2020
  • Amhara woreda fact sheets 2011 EFY, PDF
  • BG woreda fact sheets 2011 EFY
  • Oromia Woreda Fact sheets by 2011 EFY in PDF
  • SNNP woreda fact sheets by 2011 EFYin PDF
  • Tigray woreda fact sheets by 2011 EFY
  • Amhara Region COWASH 1-3 Fact Sheet
  • BG Region COWASH 1-3 Fact Sheet
  • SNNP Region COWASH 1-3 Fact Sheet
  • Tigray Region COWASH 1-3_Fact sheet
  • Oromia Region COWASH 1-3 Fact Sheet
  • Zigem 1
  • Yilmana Densa 1
  • Wadla 1
  • Woredas From Q to Z
  • Woredas starting with H, K and M
  • Woredas starting with F and G
  • Woredas starting with E
  • Woredas starting with D
  • Woredas Starting with B and C
  • Woredas starting with A
  • BG woreda Maps in the word document
  • SNNP woreda Maps on word document
  • Tigray Woreda Maps in word document
  • Oromia woreda maps from J to T
  • Oromia Woreda Maps from A to H
  • TOT on COVID_Oromia
  • TOT on COVID_Oromia
  • Fortune article on COWASH on August 2, 2020
  • The Ethiopian Herald news on COWASH on July 29, 2020
  • 01. Tigray
  • 02 Amhara
  • 03 oromia
  • 04 SNNP
  • 05 BG
  • COVID images
  • Disability
  • AHEAD
  • Disability knowledge
  • A2 poster in Amharic
  • Other amharics
  • Other facts
  • Handwash
  • Health workers
  • Other facts
  • Handwash
  • Health workers
  • Home care
  • Infographic-prevention
  • Generic 1
  • Generic 2
  • Generic 3
  • Generic 4
  • Generic Presentations
  • Masks
  • MHM
  • Myths
  • 10 key steps of CMP
  • Pregnant women
  • Stress and risk groups
  • Transmission
  • Water point
  • COWASH COVID overall briefing
  • Identification Criteria and WP prioritization
  • CMP Guideline and Rehabilitation
  • Formats for CMP
  • Some CMP formats in Word
  • Guide for Community water schemes COVID-19 resilience building
  • Spring protection sanitary inspection
  • Amharic Dug well sanitary inspections
  • English Dug well sanitary inspections
  • Autocad drawings
  • Health Centers and Health Posts
  • School WASH COVID guidelines
  • COVID resilience building in COWASH households
  • HH water management practices Part 1
  • HH water management practices Part 2
  • Amharic household water management practises
  • Ahead materials as JPG
  • AHEAD-Corona-Virus-Toolkit
  • Preparations for GBV, HTP and DI assessment
  • Reporting quidelines and formats
  • COMMUNITY WP SELECTION_PRESENTATION
  • INSTITUTION SELECTION_PRESENTATION
  • COWASH 6 MONTHS EXTENSION PLANNING TEMPLATE_PRESENTATION
  • COWASH 6 MONTHS QUARTERLY REPORTING OUTLINES_PRESENTATION
  • Communication and advocacy in COVID
  • Presentations on GBV, HTP and DI
  • Presentation of COWASH in 9 years
  • COWASH quarterly report January-March 2012
  • Overall presentation on COWASH 6m extension
  • Presentation on CMP Implementation in COWASH III Extension
  • Presentation on Community hand wash facility
  • presentation on Hand wash design at health post
  • presentation on Hand wash design at the health center
  • Presentation on Hand wash design at schools
  • Presentation on Sanitary Inspections
  • GPS setting and water point coordinates
  • Full MSF 10 Proceedings 260220 b
  • Summarized MSF 10 Proceedings 260220 b
  • National self supply policy guideline
  • Amharic version of community water hand wash design guideline
  • Training Report_COWASH _31.8.2020
  • Training Report_COWASH _31.8.2020
  • COWASH News Amharic
  • COWASH III 9 Years Brief
  • COWASH III 2009-2011 EFY Cumulative Performance Report
  • COWASH Phase III Extension Project Brief Pager
  • CR-WSP audit finding dissemenation workshop Report Nov 2019
  • FINAL COVID-19 WASH Inclusion
  • Amharic_inclusive response to COVID-19 at the household level_10920
  • Inclusive response to COVID-19 at the household level 010920
  • 25 years of Finnish support 171119
  • COWASH I-III Suomi Final
  • Vesisektori Etiopiassa Jukka Aronen
  • COWASH I-III Suomi Final 091119
  • CMP woredas
  • Vesisektori Etiopiassa Jukka Aronen 160620
  • 25 years of Finnish support 171119
  • COWASH guidelines and manuals 280120
  • 25 years of Finnish support 171119
  • COWASH I-III Suomi Final 091119
  • Vesisektori Etiopiassa Jukka Aronen 160620
  • A day in the life of community in Basona Woreda 140719
  • CMP woredas
  • Adapting CMP approach in schools 220620
  • CMP scaling up story in Amhara 290419
  • Community procurement in Abichu Gna woreda 260119
  • Story of CMP development in Basona Warena 030719
  • Antsokia disability inclusion best practice in RPS 060818
  • Disability integration in Woredas 200419
  • Inclusive 4 faucet tap design in COWASH III 140220
  • Reaching the most vulnerable, EWDNA, 270718
  • Walking the talk, COWASH inclusion, 250418
  • Adapting CMP approach to improve WASH in schools 050920
  • Community Procurement 060219
  • COWASH contribution to the WASH Sector 050920
  • Artisans in Arbaminch Zuria Woreda, 140719
  • Artisans in COWASH 140719
  • How to turn setbacks into comebacks, Female Artisan in AMZ 140719
  • Only Female artisan in AMZ Woreda 240619
  • Spare Part Supply Enterprise In Basona Worana060420
  • Sanitation Marketing in Medebaye-Zana 310718
  • A case in balance, sanitation marketing in Medebaysana 270718
  • Women-led MSE development process in COWASH 040518
  • Briefing on Women-led MSEs_COWASH 250119
  • Lessons learned in MSE development 080219
  • MSEs learning note 3
  • SECRSM brief 080219
  • Lesson on SECRSM implementation 191218
  • Lessons learned in COWASH CR-WSP 060219
  • Water Schemes Maintenance Enterprise 070920
  • COWASH Perfomance Monitoring Learning note 091119
  • COWASH Perfomance Monitoring Learning note 091119
  • Capacity Development in COWASH 040920
  • COWASH capacity building interventions 040920
  • COWASH support to woredas, 170120
  • COWASH 2018 Mid Term Evaluation, 070618
  • COWASH contribution to the WASH Sector 050920
  • CMP research project
  • Gender Learning Note 260916
  • Women Empowerment in COWASH, English, 100419
  • Women Empowerment in COWASH, Afan Oromo 240619
  • Women Empowerment in COWASH, Amharic, 030519
  • Women empowerment in COWASH, Tigrigna, 070519
  • Addressing Women's Empowerment 050920
  • Impacting on women in COWASH 080219
  • Gender Case Study on WASHCO Performance, 2016
  • Ele Spring WASHCO in Genta Bonke in AMZ woreda 121216
  • National hygiene & sanitation strategic action plan (UAP II)
  • In Search of water in Benishangul Gumuz 310718
  • Life of Rural Community in Gonji Kolella of Amhara 121216
  • Women Led WASHCO in Abichugnea Woreda 121216
  • Zegemesk Spring in Amhara, 270718
  • Best Performing WASHCOs in Tigray Region260520
  • The Steward, Yelibe, 261214
  • The Leader, Zinash Abebe, 280217
  • Water and Job, Medihanit Chekol, 270718
  • The farmer story, Ato Menibel 220419
  • COWASH in Abichu Gnea Woreda 110519
  • Dejen Woreda of Amhara Region 120519
  • Fogera Woreda, Amhara Region 020519
  • Guagusha Shikudad Woreda of Amhara 030519
  • COWASH 2018 Mid Term Evaluation, 070618
  • COWASH towards financial transparency and accountability 250418
  • Healing the Scars in Genta Bonke of AMZ woreda 270718
  • COWASH school WASH story 261218
  • Saving water, (Amharic) 190219
  • WASHCO legalization status in COWASH regions 080120
  • COWASH guidelines and manuals 280120
  • COWASH I-III results Nov 2019
  • Rural Water Supply O&M manual brief summary, 221119
  • Final Endline Survey Report for COWASH III Project May 30, 2020
  • COWASH learning note disabilities final
  • Lessons learnt in the accessibility of water points and institutional latrines 130820
  • Water Supply System Management (WSSM) TOR final doc
  • WASHCO legalization proclamation for Benishangul-Gumuz region
  • COVID-19 Directive 30-2020 (051020)
  • Final revised GEDI ToR as per the WB comments (14.07.20)
  • OWNP-CWA Phase -I Draft Program Completion Report_25 June 2020
  • CR-WSP audit finding dissemenation workshop Report Nov 2019
  • CR-WSP audit finding dissemenation workshop Report Nov 2019
  • DRAFT Report on CR-WSP Auditing to 10 TWSSE and 6 RCMWS
  • Abergele COWASH 1-3
  • WASHCO legalization regulation for Benishangul-Gumuz region
  • Rapid assessment of COVID-19 knowledge and attitudes in Assosa
  • Agenda and registration
  • Handouts
  • Other materials
  • Overall contents
  • Sessions 1-12
  • Amharic ppt for Liquid Soap Production
  • Training on Liquid Detergents, English
  • 76 Woredas COWASH 1-3 Fact Sheet_141220
  • Tigray Region Woredas' Fact Sheet_141220
  • SNNPR Region Woredas' Fact Sheet-141220
  • OROMIA Region Woredas' Fact Sheet_141220
  • BG Region Woredas' Fact Sheet_141220
  • Amhara, from Farta to Zigem
  • Amhara, from Abergele to Enarg Enawga
  • Amhara, from Farta to Zigem
  • Amhara, from Abergele to Enarg Enawga
  • BG Region Woredas' Fact Sheet_141220
  • SNNPR Region Woredas' Fact Sheet-141220
  • OROMIA Region Woredas' Fact Sheet_141220
  • Capacity Development Plan in Rural WaSH (draft)
  • Tigray Region Woredas' Fact Sheet_141220
  • COWASH 4 Appraisal report
  • COWASH 4 Project Document
  • National_Market_Based_Sanitation Training Manual_Dec_2020_Final
  • National_Market_Based_Sanitation_Implementation_Guideline_2020_final
  • Lessons learnt in the accessibility of water points and institutional latrines 090221
  • COWASH learning note disabilities 160920
  • Lessons learnt in the accessibility of water points and institutional latrines 090221
  • Menstrual Lives in Rural Ethiopia
  • School WASH accessibility audit report and suggestions for improving accessibility
  • School WASH accessibility audit report and suggestions for improving accessibility
  • COWASH III 2009-2012 EFY Result Based Completion Report_Draft5
  • COWASH III Completion Report, Volume II, Annexes
  • CMP woredas in the regional map of Amhara
  • Valuing Water as an input to production and socio-economic activity
  • Valuing Water Services
  • Valuing Water Sources and Infrastructure
  • Read out on World Water Day 2021
  • WWD One Pager final
  • Vacancy anouncement BCS April 2021
  • Vacancy anouncement WSPS April 2021
  • Vacancy anouncement WSPS April 2021
  • CMP woredas on the map of Amhara region
  • Ethiopia Humanitarian Fund Strategy Paper - April 2021
  • Mini EDHS 2019_Final Report
  • Mini EDHS 2019_Final Report
  • 250521 Over two decades of community, News of Niras
  • 290521 COWASH IV News in Addis Standard Facebook page
  • CMP woredas on the map of Benishangul-Gumuz region
  • 260521 GoF support to WASH 27 years
  • Bilateral Agreement COWASH IV
  • Framework Agreement
  • COWASH 4 Appraisal report
  • COWASH 4 Project Document
  • CMP woredas on the map of SNNPR region
  • Diagnosis check lists
  • Water Agent Duties and Evaluation
  • WP Grading
  • WUAF Checklist of intervention
  • WUAF Dashboard
  • WUAF Level
  • DB above ground
  • DB on slope
  • CMP woredas on the map of Tigray region
  • Concrete Reservoir Construction
  • Reservoir DB Technical drawing
  • Reservoir Technical Drawing
  • WP Cattle trough
  • WP Double Elevation
  • WP Double Top View
  • WP School pipe
  • WP School Side
  • WP School Top
  • WP Simple Elevation
  • CMP woredas on the map of Oromia region
  • WP Simple Top View
  • IAF RCBDIA Presentation Social
  • IAF RCBDIA Presentation Technical
  • Rural Water supply Standards
  • AMCOW African Sanitation Policy Guidelines 2021
  • M&E in the Rural Water Sector in Ethiopia, Aug 2021
  • Policy Analysis of Ethiopia’s Rural Water O&M Policiesm Aug 2021
  • 240821 COWASH General Presentation
  • Policy Analysis of Ethiopia's Rural Water OM Policies
  • Blog writing on Maintenance – The Key to Water Infrastructure Development
  • Vacancy anouncement CDS September 2021
  • SNNP MoU of COWASH IV
  • Sidama MoU of COWASH IV
  • Oromia MoU of COWASH IV
  • BG MoU of COWASH IV
  • Amhara MoU of COWASH IV
  • School WASH management, maintenance and Operation Guide
  • 20210802 MoF salary scale regulation
  • COWASH News on signing MOU for Phase IV
  • Situational Analysis Report on Gender Equity and Disability Inclusion for WASH Sector in Eth _Final
  • National Gender Mainstreaming Manual Amharic version -Final Edited (2)
  • National Gender Mainstreaming Manual English version,12 April 2021
  • Global Hand Washing Day 2021
  • 2021 GHWD Theme of Ethiopia
  • Roles and Responsibilities of COWASH IV Stakeholders, Final
  • COWASH IV Federal PAM v7
  • MoF and BoF MoU on COWASH IV Amhara and BG
  • MoF and BoF MoU on COWASH IV Oromia, Sidama and SNNP
  • Guide to apply work permit, final
  • Regional commitment letters
  • Financial Management Manual and PPT, final
  • Financial Management Manual and PPT, final
  • COWASH IV GoF budget allocation formula, final
  • Short term consultant recruitment process in COWASH 4
  • Gender Transformative & Disability Inclusive WASH Strategy in COWASH IV_Final
  • Draft National Water Policy and Strategy March 2020
  • Draft National Water Policy and Strategy March 2020
  • National WASH invetory_2 and MIS Report
  • National Ethiopia ODF Campaign 2019-2024
  • National Ethiopia ODF Campaign 2019-2024
  • COWASH IV CMP Implementation Manual Using WoF
  • CMP research project
  • COWASH IV CMP Investment Fund Management Guideline using MFIs
  • COWASH IV Institutional WASH Implementation manual using WMP
  • COWASH IV Training manual on Institutional WASH Implementation using WMP
  • List of COWASH IV training materials related to CMP Management
  • COWASH IV Communications Goals
  • ToR for Regional Support Units Oct 2021 V3
  • MoF Financial Specialist ToR
  • COWASH IV Project Woredas
  • COWASH IV SECRSM Guideline
  • COWASH IV WSP4+ Working Manual
  • COWASH IV Result Framework and Performance Monitoring Plan_3
  • COWASH IV assets transferred from Phase III and procured in Phase IV
  • COWASH IV Guideline to apply and organise work permit and ID
  • COWASH IV Indicators Reference Sheet1
  • COWASH IV 2014 EFY Core Plan, Amhara
  • COWASH IV 2014 EFY Core Plan, BG
  • COWASH IV 2014 EFY Core Plan, Oromia
  • COWASH IV 2014 EFY Core Plan, Sidama
  • COWASH IV 2014 EFY Core Plan, SNNP
  • COWASH IV 2014-2017 EFY Federal Level Plan V3
  • MoF Financial Specialist ToR
  • 20210802 MoF salary scale directive
  • National Standard Definitions for Sanitation and Hygiene
  • COWASH SBC Strategy-Final
  • COWASH IV Gender Transformative & Disability Inclusive WASH Strategy
  • COWASH IV WASH- SLA Training Facilitators Guide
  • COWASH IV 2014-2017 EFY Federal Level Plan V3
  • COWASH IV 2014 EFY Core Plan, Amhara
  • COWASH IV 2014 EFY Core Plan, BG
  • COWASH IV 2014 EFY Core Plan, Oromia
  • COWASH IV 2014 EFY Core Plan, Sidama
  • COWASH IV 2014 EFY Core Plan, SNNP
  • COWASH IV 2014-2017 EFY Federal Level Plan V3
  • COWASH IV WASH- SLA Training Facilitators Guide
  • COWASH IV Gender Transformative & Disability Inclusive WASH Strategy
  • COWASH SBC Strategy-Final
  • COWASH IV Social Behavioural Change Training Manual
  • COWASH Social Behavioural Change Strategy
  • Health policy of Ethiopia 1993
  • COWASH IV Financial Specialist ToR employed by MoF
  • COWASH IV GoF budget allocation formula, final
  • MoF salary scale directive August 2021
  • Financial Management Manual and PPT, final
  • Regional commitment letters
  • Signed MoUs between the MoF and 5 Regional BoF
  • COWASH IV Project Woredas
  • COWASH IV Indicators Reference Sheet
  • COWASH IV Result Framework and Performance Monitoring Plan
  • COWASH IV assets transferred from Phase III and procured in Phase IV
  • COWASH IV Federal Project Administration Manual
  • COWASH IV Guide to apply work permit, final
  • COWASH IV Short term consultant recruitment process
  • COWASH IV Stakeholder Roles and Responsibilities
  • COWASH Annual Report 2004 EFY
  • ToR for Regional Support Units Oct 2021
  • COWASH IV SECRSM Guideline
  • COWASH IV WSP4+ Working Manual
  • COWASH IV Communications Goals
  • COWASH IV CMP Implementation Manual Using WoF
  • COWASH IV CMP Investment Fund Management Guideline using MFIs
  • COWASH IV Institutional WASH Implementation manual using WMP
  • COWASH IV Training manual on Institutional WASH Implementation using WMP
  • List of COWASH IV training materials related to CMP Management
  • Draft HH4A strategic road map Sep 2021
  • Draft Sanitation Subsidy Protocol_ 13_July_2021_Revised
  • Draft Sanitation Subsidy Protocol_ 13_July_2021_Revised
  • FTAT detailed budget for Phase IV
  • Steering Committee Meetings minutes
  • COWASH IV 2014 EFY DETAILED PLAN TEMPLATE
  • COWASH Phase IV Baseline Survey Terms of Reference
  • Amhara, BG, Oromia and SNNP 2013 EFY reports
  • Amharic community procurement guideline for COWASH Phase IV
  • COWASH WQ monitoring plan for new water points
  • Business Health Assement Tool
  • Saving book - English Version, draft
  • Annex 11. Issues to be considered in the development of COWASH IV Communication Strategy
  • Issues to be considered in the development of COWASH IV Communication Strategy
  • CMP Reserch Presentation
  • COWASH budget plan with MoF
  • Training Guideline on Women's Leadership in WASHCO Management, English
  • Gender Transformative & Disability Inclusive WASH Strategy in COWASH IV_Final
  • Training Guideline on Women's Leadership in WASHCO Management, English
  • Gender Transformative & Disability Inclusive WASH Strategy in COWASH IV_Final
  • Quarter 1 2005 EFY Performance Report
  • COWASH Phase IV 2014-2017 EFY Federal Level Plan V4
  • ToR for Regional Support Units Jan 2022 V4
  • COWASH Phase IV 2014-2017 EFY Federal Level Plan V4
  • COWASH IV CORE PLAN TEMPLATE_Version 5
  • ToR for Regional Support Units Jan 2022 V5
  • Applying work permits from the MoLSD_COWASH IV
  • Draft Pictorial_Guidance_for_Classification_of_Dry_Pit_Latrines
  • COWASH Quarter 1 2005 EFY Performance Report
  • Draft Pictorial_Guidance_for_Classification_of_Dry_Pit_Latrines
  • Integrating women in MBS
  • National_Market_Based_Sanitation Training Manual_Dec_2020_Final
  • National_Market_Based_Sanitation_Implementation_Guideline_2020_final
  • Transform WASH Market based sanitation TOR
  • Composting toilet benefits
  • Draft HH4A strategic road map Sep 2021
  • Pocket Book_for ODF Plus
  • FINAL DRAFT PUUBLIC LATRINE DESIDGN AND MANAGEMENT MANUAL
  • Signed MoU Nov 2012
  • 2013 ARM proceeding and recommendations Diredawa
  • National Sanitation Operational Definitions-Final
  • Draft Sanitation Subsidy Protocol_ 13_July_2021_Revised
  • Reaching 100 percent sanitation access in Ethiopia, article Jan 2022
  • COWASH IV Inception Report_final
  • COWASH IV Inception Report_final
  • MSF 5 Schedule
  • 002. Ebsa, Meeting Note_HH4ALL road map finalization Workshop
  • 003. Meeting Note_of Costing plan worshop for HH4ALL roadmap
  • MSF 5 undertakin 6th draft
  • 001. Gender Based Violence support visit to BG
  • Gender Mainstreaming
  • Harmonized DSA for donor funded projects, April 2016
  • Harmonized DSA for donor funded projects, April 2016
  • DSA rates for Dev Partner funded projects, Jan 2019
  • DSA Rates for Dev Partners Funded Projects, Oct 2020
  • Perdiem and DSA rules MoF 2013 2020, Amharic
  • Growth_and_Changes_Ethiopia_Book_Amharic and English
  • Ethiopian water Resources Management Policy
  • Growth_and_Changes_Ethiopia_Book_Amharic and English
  • Growth_and_Changes_Ethiopia_Book_Amharic and English
  • MIssion Schedule Feb 28 march 9 revised
  • MAL - OWNP CWA II Joint Impelementation Support Review Mission Final
  • Proceeding of the 6 Month Review Meeting February 2022
  • Ethiopian Water Sector Strategy
  • OWNP-CWA -2012 phase I and II reports and 2013 EFY Plan of Action August 10
  • 1. OWNP-CWA Phase II Overview and Status 2022 January 21
  • Final OWNP-CWA Pae II 2013 Annual Report (002)
  • Proceeding of the 6 Month Review Meeting February 2022
  • POM Final version 10.22.19 Volume I (002)
  • MoWE Organogram Feb 2022, Amharic
  • MoWE Organogram Feb 2022 translated
  • Gener Mainstreaming Field Manual
  • Enhancing Women Leadership in WASHCO Management, Revised Training Manual, Amharic
  • Enhancing Women's leadership in WASHCO Management, Training Manual, English
  • MAL - OWNP CWA II Joint Impelementation Support Review Mission Final
  • Feb 22 - MIssion Schedule Feb 28 march 13 revised
  • WASHO Files, learning notes
  • Situational Analysis Report on Gender Equity and Disability Inclusion for WASH Sector in Eth _Final
  • Opening speech
  • PPT. Situational analysis Report on GEDI for WASH sector in Ethiopia
  • MSF 5 undertakings Schedule
  • GEI program feb 2022
  • CWA II Implementation Completion Report (ICR) WB Feb2022
  • OWNP-CWA Phase II 2014 EFY 2nd Quarter Prgress Report 26 Feb 2022
  • PPT_Training on FM of COWASH Final_October 24_2021
  • Highlight SWASH Design and Construction Presentation
  • MSF 5 undertakin 6th draft
  • Lewam-Highlight SWASH Design and Construction Presentation
  • Netsanet-School WASH O& M PPT
  • COWASH revised Presentation1
  • SWASH Design and Construction Presentation MH FNL
  • GTZ-en-technology-review-composting-toilets
  • OXFAM 4000 Spring Protection
  • School WASH accessibility audit report and suggestions for improving accessibility
  • Signed MoU Nov 2012
  • PPP_COWASH Experiences in DI_Feb 2022
  • BASICS OF PROJECT M&E_COWASH IV
  • CMP projects application preparation_2014EFY
  • CMP Promotion & eligability criteria_WWT
  • CMP WPs appraisal & approval_2014EFY
  • CMP WPs Funding agreement _2014EFY
  • Gender Mainstreaming Field Manual
  • Institutional WASH Implementation in WMP
  • Presentation in COWASH IV_Oromia 2014
  • Roles & responsibilites of CMP actors_MFI
  • SBC in COWASH IV
  • SECRSM and WSP briefing on CMP training
  • Some points on CMP_2014
  • Tips on COWASH IV communication activities
  • WASH Business and Sanitation Development Presentataion
  • WASHCO Procurement, Finance & Property Management
  • MSF 5 undertakin (6th draft)
  • Water quality monitoring in COWASH IV
  • WWT Members Training_Gender and Inclusion Presentation
  • PPP_COWASH Experiences in DI_Feb 2022
  • Presentation_Orientation_GT&DI Strategy
  • Presentation_RT_ Women Leadership in WASHCO Mgt
  • WASH SLA TRAINING
  • SECRSM ToT Feb 2022
  • SECRSM Group exercise Jan 2022
  • (Nabin's presentation)
  • Investing in Inclusion-Handbook for businesses
  • COWASH and gender equality March 2022
  • COWASH and gender equality March 2022
  • Measuring disability
  • MoWIE Ten Years Strategic Plan final Draft_English Version 31 March 2021
  • The 2022 WWD, final
  • WWD2022-News-Release on Groundwater
  • CMP Approach Implementation Steps
  • COWASH Disability Inclusion_Illustrations
  • COWASH IV OUTCOMES
  • Disability Checklist for Training Attendees
  • CMP Water Schemes Application Form _Annex A to CMP Guideline
  • Water Schemes Application_ Field Appraisal Form_Annex E to CMP Guideline
  • Water Schemes Application_Desk Appraisal Form_Annex D to CMP Guideline
  • Hand dug well disability inclusive design
  • Presentation. COWASH Experiences in Disability Inclusion March 24, 2022
  • Presentation_Orientation_GT&DI Strategy
  • Presentation_RT_ Women Leadership in WASHCO Mgt
  • (Meron's presentation)
  • Presentation of COWASH IV Financial management May 2021
  • PPT_Training on FM of COWASH Final_October 24_2021
  • Presentation. SBC in COWASH IV Feb 2022
  • Presentatuions on communication in COWASH May 2021
  • Presentation. SECRSM ToT Feb 2022
  • Presentation. WASH SLA TRAINING Feb 2022
  • (Yewondwossen's presentation)
  • BASICS OF PROJECT M&E_COWASH IV
  • CMP Promotion & eligability criteria_WWT
  • CMP WPs appraisal & approval_2014EFY
  • CMP WPs Funding agreement _2014EFY
  • Institutional WASH Implementation in WMP
  • Measuring disability
  • Presentation in COWASH IV_Oromia 2014
  • Roles & responsibilites of CMP actors_MFI
  • SBC in COWASH IV
  • SECRSM and WSP briefing on CMP training
  • (Matthew's presentation)
  • Some points on CMP_2014
  • Tips on COWASH IV communication activities
  • WASHBU~1
  • WASHCO~1
  • WWTMEM~1
  • BASICS OF PROJECT M&E_COWASH IV
  • CMP projects application preparation_2014EFY
  • Water quality monitoring in COWASH IV
  • WWTMEM~1
  • WASH Business and Sanitation Development Presentataion
  • WASHCO Procurement, Finance & Property Management
  • Green Legacy in Etiopia, WWF 9, March 2022, in Arabic
  • Green Legacy of Ethiopia, WWF 9, March 2022
  • Hydropower in Ethiopia, WWF 9 in Senegal, March 2022
  • Climate Resilient WASH, WWF 9, March 2022
  • Climate Resilient WASH, WWF 9, March 2022
  • Schedule for developing National WASH Sector Capacity Development Guideline Aug 30, 2021
  • Final ToR for WASH Capacity Assessment and CB Guideline Augst 30,2021
  • Inception report NATIONAL WASH SECTOR CAPACITY DEVELOPMENT
  • COVID directive published April 1, 2022
  • ToR for MTR - 6 April 2022 WB
  • COWASH IV Internal Audit Guideline, draft 1
  • ToR for the preparation of O&M Training Manual for Schools WASH (005)
  • Final 2022 April COWASH Disability Inclusion Training-Dr Abebe
  • Highlight on Gender and Disability Inclusion Strategy in COWASH IV
  • Final 2022 April COWASH Disability Inclusion Training-Dr Abebe
  • Highlight on Gender and Disability Inclusion Strategy in COWASH IV
  • 2014 gender leader ship training final
  • 2014 gender leader ship training final
  • Oromia Proclamation for WSS service
  • COWASH Project Document revision
  • Final Revised English COWASH Disability Inclusion Guideline April 2022
  • Water Quality Monitoring Manual
  • National Ethiopia ODF Campaign 2019-2024
  • Ethiopia ODF_qualitative insights report
  • Rural Water Supply and Sanitation System Management (WSSM) TOR final doc
  • RWSSSMG WORKSHOP Schedule
  • RWSSSM Guideline final
  • National WASH financing Core group meeting minute 27 May 2022
  • FTAT Comments on Draft School WASH OM&M Manual rev 1
  • Presentation of RWSSSM 31.5.2022
  • Final_Revised_Amharic_Training Guideline on Women's Leadership in WASHCO Management_Feb.22
  • Final_Revised_English_Training Guideline on Women's leadership in WASHCO_ 210222
  • Final_Revised_English_COWASH Disability Inclusion Guideline_181017_Rev. 04'22
  • Project Document revision
  • Final_Revised_English_COWASH Disability Inclusion Guideline_181017_Rev. 04'22
  • Final_Revised_Amharic_Training Guideline on Women's Leadership in WASHCO Management_Feb.22
  • Final_Revised_English_Training Guideline on Women's leadership in WASHCO_ 210222
  • Final_Revised_Afan Oromo_Training Guideline on Women's Leadership in WASHCO Management
  • Final_Revised_Afan Oromo_Training Guideline on Women's Leadership in WASHCO Management
  • May_2022_Revised_Afaan Oromo_F_Brochure, Women Empowerment in COWASH IV
  • May_2022_Revised_Amharic_F_Brochure, Women Empowerment in COWASH IV
  • May_2022_Revised_English_F_Brochure, Women Empowerment in COWASH IV
  • National WaSH Coordination Office ToR (2009);(Un-official)
  • National Sanitation Subsidy Protocol-final4printing-2022
  • Sululta Woreda Water Supply
  • Chefie-tokofa kebele water supply, Sululta woreda
  • Werarasa Keta PS Water supply story final version
  • Werarasa Keta PS Water supply story final version
  • Clean water for quality education
  • Draft National Protocol for Hygiene and "on-site" Sanitation, Dec. 2005
  • National Hygiene and Sanitation Strategy for Ethiopia, Oct. 2005
  • Afan Oromo_COWASH disability Inclusion Guideline (8.19.22)
  • English_COWASH Disability Inclusion Guideline8.19.22_
  • WaSH M&E Framework and Manual Version 1.0
  • Yem WASH SLA case story Final
  • Yem WASH SLA case story Final
  • Kersa woreda COWASH pracice, nmc, FOF
  • Kersa woreda COWASH pracice, nmc, FOF
  • National Drinking Water Quality Monitoring and Surveillance Strategy May. 2011 (Un-offical)
  • Globa Hand Washing Day, Final pdf
  • The 2022 Global Hand Washing Day
  • Globa Hand Washing Day, Final pdf
  • Globa Hand Washing Day, Final pdf
  • Story on SBCC final pdf
  • Implementation Guideline for CLTSH Programming, Jan 2012 (Un-official)
  • Oromia, On Truck region in COWASH IV Final...
  • "Oromia, on-truck Region in COWASH IV
  • Home -made Chlorine for Sustainable Use
  • Home-made chlorine, for sustainable use final
  • National Monitoring and reporting system for the implementation of CLTSH, Jan.2012 (Un-official)
  • CLTSH Facilitation Training Guide, Jan. 2011 (Un-official)
  • CLTSH verification and certification protocol (Un-official)
  • Health Management Information System (NMIS) Jan 2008
  • National WaSH Coordination Office ToR (2009);(Un-official)
  • Draft National Protocol for Hygiene and "on-site" Sanitation, Dec. 2005
  • Draft National Protocol for Hygiene and "on-site" Sanitation, Dec. 2005
  • Ethiopian Water Sector Policy, 2001
  • Gender Mainstreaming Field Manual, 2005
  • Ethiopian Water Sector Strategy, 2001
  • Gender Mainstreaming Guidelines and checklists for the Water Sector, 2001
  • COWASH Quarterly Report July - September 2012
  • COWASH quarterly report July - September 2012
  • MSF 5 Undertakings 6th draft, Nov. 2012
  • Assessment of the CMP approach in developing rural water supply schemes, A theis by Meron Mebrahtu, Addis Ababa, Institute of Technology, 2012
  • CMP approach: an opportunity to improve the community ownership in fluoride mitigation in Ethiopia
  • COWASH biannual report July 2012 - January 2013
  • CMP implementation manual for manual drilling
  • Ahmed Muhumed, B.Sc thesis: Sustainability of Rural Water Services Implemented Using CMP Approach in Amhara Region
  • Nabin Sharma, M.Sc thesis: CMP in Implementing Rural Water Supply in Amhara Region
  • Meron Mebrahtu, M.Sc thesis: Assessment of the CMP Approach in Developing Rural Water Supply Schemes, Benishangul-Gumuz Region
  • Yewondwossen Tesfaye, M.Sc thesis: A Comparative Study on Woreda Managed and CMP Rural Water Supply Projects
  • Hurst & Moges, PhD draft article: Evaluation of Sustainability and Health Impacts of CMPs for Sostu Kirba Kebele
  • School latrine in Guangua woreda, Amhara region
  • School latrine in Guangua woreda, Amhara region
  • School latrine in Guangua woreda, Amhara region
  • School latrine in Guangua woreda, Amhara region
  • School latrine in Guangua woreda, Amhara region
  • School latrine in Guangua woreda, Amhara region
  • School latrine in Guangua woreda, Amhara region
  • Design and Construction Manual for Water Supply and Sanitary Facilities in Primary Schools
  • Water Safety Planning Trainees
  • Artisan trainees
  • Artisan trainees
  • Full WaSH Implementation Framework (WIF).pdf
  • MSF 5 proceeding
  • WaSH Implementation Framework (WIF) summary
  • Signed WaSH Implementation Framework (scanned)
  • Introduction to the CMP approach
  • CMP and high technologies
  • Dafili gravity water supply scheme
  • Gochor gravity water supply scheme
  • Dafili socio-ecomic & tariff study
  • FinnWASH-BG financial management practise
  • UNICEF's past and future position on CMP approach
  • COWASH quarterly report July 2012 - April 2013
  • CMP approach: an opportunity to foster integrity in rural WASH
  • Proceedings of the CMP high technology experience sharing event
  • CMP high technology experience sharing event
  • CMP high technology event
  • Water integrity forum
  • OWNP Project Document
  • OWNP brochure
  • OWNP poster
  • Communication and training methodology / Participant guide
  • Report on communication and design methodology training, August 2013
  • Training participants
  • Communications training
  • Case study on sector collaboration in Ethiopia
  • Part A Introduction to O&MM
  • Part B decription of Water Sources and Technologies
  • Part C Technical O&M requirments
  • Part D Community Based Rural Water Supply Schemes Managment
  • Part E Rural Water Supply Spare Parts Managment
  • Part F M&E and reporting system update_1
  • Part G Water Supply Safety Plan
  • Part H Preparation of Action Plan and Implementation of O&M
  • Part A Introduction to O&MM
  • Part A Introduction to O&MM
  • Part B decription of Water Sources and Technologies
  • Part C Institutional Support Mechanisms
  • Part D Rural Water Supply schemes Managment
  • Part A Introduction to O&MM
  • Part A Introduction to O&MM
  • Part B Description of Water Sources and Technologies
  • Part C Technical O&M requirements
  • Part D Community Based Rural Water Supply Schemes Management
  • Part E Rural Water Supply Spare Parts Management
  • Part F M&E and reporting system update 1
  • Part G Water Supply Safety Plan
  • Part H Preparation of Action Plan and Implementation of O&M
  • Part A Introduction to O&MM
  • Part B Description of Water Sources and Technologies
  • Part C Institutional Support Mechanisms
  • Part D Rural Water Supply schemes Management
  • Part E Rural Water Supply Spare Parts Management
  • Part F M&E and reporting system
  • Part G Water Supply Safety Plan
  • Part H Preparation of Action Plan and Implementation of O&M
  • Annual Report July 2011-June 2012
  • COWASH annual report July 2011-June 2012
  • COWASH annual report July 2012 - June 2013
  • National Guideline for Technical Service Provision to Customers by Urban Water Supply Utilities
  • National Guideline for Urban Water Supply & Sewerage Services Organization Setup
  • National Guideline for Urban Water Supply & Sewerage Services Organization Setup
  • National Guideline for Urban Water Utilities Categorization
  • National Guideline for Urban Water Utilities Tariff Setting
  • Operation and Maintenance Manual for Urban Water Utilities
  • Revised COWASH Project Document, Sep 30, 2013
  • Catchment assessment tool, Draft
  • Environmental risk assessment tool, Draft
  • Geological assessment tool, Draft
  • Section 3 Climate Risk Screening Description, Draft
  • Working Paper on CRM Water Tools, Draft
  • Amhara Region WASH MoU
  • Gambella Region WASH MoU
  • Harari Region WASH MoU
  • Somali Region WASH MoU
  • A hidden resource publication
  • Final Self Supply Policy Guideline -27 January
  • SSAP A3 posters final draft
  • SSAP brochure final draft
  • SSAP communications strategy final draft
  • OWNP Socual Assessment Report
  • OWNP Social Assessment Report
  • WASH II ESMF
  • WASH II RPF
  • Mainstreaming Crosscutting Issues in COWASH
  • Communication and Training Methodology Course Participant Guide
  • CMP and gender step by step guide
  • CMP and gender step by step guide
  • COWASH quarterly report July 2013-September 2013
  • EVALUATION OF CMP RESEARCH PROJECT 2012 – 2014
  • ReCMP recommendations on 10.12.2013
  • EVALUATION OF CMP RESEARCH PROJECT 2012 – 2014
  • EVALUATION OF CMP RESEARCH PROJECT 2012 – 2014
  • Evaluation of CMP Research Project 2012 – 2014
  • Evaluation of CMP Research Project 2012 – 2014
  • Evaluation of CMP Research Project 2012 – 2014
  • Design and Construction Manual for Water Supply and Sanitary Facilities in Primary Schools in Ethiopia
  • Design of CDF and Credit Products
  • Checklist for project completion
  • COWASH woredas baseline as per the NWI
  • ReCMP recommendation 10.12.13
  • ReCMP recommendations 10.12.13
  • Research Proposals
  • Mebit Mitiku presentation in FLoWS on Nov 28, 2014
  • COWASH Commitment Letters from Regions
  • Amhara Supply Chain Assessment in 2013
  • Health Facility WASH Design Guideline
  • CMP implementation manual for Institutional Sanitation
  • Annexes for CMP Institutional sanitation manual
  • Human Resources Development in Ethiopian WASH sector
  • Introduction of CMP into One WASH
  • Mebit Mitiku, M.Sc thesis: Evaluation of the level of service rendered by functioning rural water supply schemes: case of Farta Woreda
  • parliamentarists
  • delegation
  • Training Impact Assessment fo 2004 EFY trainings
  • MSF6
  • MSF6-2
  • National Sanitation Marketing Guideline (2013)
  • National Sanitation Marketing Guideline(2013)
  • Region Specific Supply Chains for Hand pumps and Spare Parts in Ethiopia, May 2010
  • Manual for Accelerating Self Supply Program in Ethiopia (Jan 2014)
  • Manual for Accelerating Self Supply Program in Ehiopia (Jan 2014)
  • Manual for Accelerating Self Supply in Ethiopia (Jan 2014)
  • Water Sector Working Group leaflet (Jan 2014)
  • Number of CMP
  • COWASH woredas-NO BG 14 v3
  • COWASH woredas-NO BG 14 v3
  • COWASH woredas-NO BG 14 v3
  • COWASH woreda map 27.2.2014
  • MoWIE 6-months review meeting
  • Water supply coverage
  • ODF Sustainability Study (Dec 2013)
  • Analyzing Policy Blockages to Equitable and Inclusive WASH in Ethiopia, June 2013
  • WASH CSOs Annual Report for 2011-2012
  • COWASH experience in Amhara 1
  • COWASH WSP experience in Amhara 1
  • COWASH WSP experience in Amhara 2
  • German Agro Action WSP experience in Oromia
  • COWASH WSP experience in Amhara 1
  • HfDW WSP experience in Tigray
  • WSP in general by UNICEF
  • WSP
  • Ramboll-logo
  • Vacancy announcement March 2014
  • Ramboll-logo2
  • Ramboll-logo2
  • Vacancy anouncement March 2014
  • HfDW WSP experience in Tigray
  • COWASH WSP experience in Amhara 1
  • COWASH WSP experience in Ammhara 2
  • GAA WSP experience in Oromia
  • Inception report of CMP Implementation Manual Development (March 2014)
  • WSP workshop proceedings (March 2014)
  • COWASH quarterly report July 2013-December 2013
  • HUMAN RESOURCES AND PHYSICAL CAPACITY DEVELOPMENT IN ONE WASH (Feb 2014)
  • HUMAN RESOURCES AND PHYSICAL CAPACITY DEVELOPMENT IN ONE WASH (Feb 2014)
  • COWAH Launch Workshop in Benishangul-Gumuz Region, March 14-15, 2014
  • Core elements of CMP
  • COWASH link to One WASH and WASH Coordination
  • HRD in One WASH
  • Introduction
  • Overwiew of COWASH M&E
  • Core Planning
  • COWASH Component 2 and Financing Agreement
  • RSU establishment and roles and responsibilities
  • Overview of COWASH M&E
  • COWASH Revised Project Document, Sep 30, 2013
  • 4th Annual CSO WASH Report (31.1.2014)
  • WSP Workshop (March 5, 2014) Proceedings
  • me
  • gis
  • Final Draft WSWG ToR, April 2014
  • CMP appoach, Avola spring in Senkegna, Yilmana Densa Woreda.pdf
  • MSF 6 Proceedings, Summary
  • Speech of H.E Ato Alemayehu, The Minister of MoWIE
  • Speech of H.E. Ato Fuad, State Ministeer of MoE
  • Speech of H.E. Dr. Kebede, The MoH
  • Speech of H.E. Dr.Kebede, The State Minister of MoH
  • Speech of Ato Robel Lambisso, on Behalf of CSOs
  • Evaluation of ReCMP Findings and recommendations 30.5.14
  • ReCMP News
  • Health Facility WASH Manual
  • Kebele Water Safety Plan Gudeline (May 2014)
  • 1. KWSP Introduction power point
  • 2. KWSP team establishment
  • 2. KWSP Team Establishment Power Point
  • 2. KWSP team establishment power point
  • 3. KWSP wells and pumps power point
  • 4. KWSP springs power point
  • 5. KWSP rural piped schemes power point
  • KWSP water safety alternatives power point
  • 6. KWSP water safety alternatives power point
  • 7. KWSP financing power point
  • Case Study of Ele gravity scheme in SNNPR
  • Case study of Avola and Araya springs in Amhara
  • COWASH quarterky report July 2013-March 2014
  • COWASH quarterly report July 2013-March 2014
  • COWASH quarterly report July 2013-March 2014, Annex 1
  • COWASH quarterly report July 2013-March 2014
  • Final One WASH Program Operational Manual
  • FRA Mitigation Plan
  • Final One WASH Program Operational Manual
  • Opening session keynote speeches and presentations
  • Opening Session keynote speeches and presentations
  • One WASH Coordination Presentations
  • JTR and CSO report presentations
  • Sustainable services in WASH
  • One WASH M&E
  • H&S in One WASH
  • Proceedings and program
  • Final Draft WSWG ToR
  • Final One WASH POM July 7, 2014
  • WaterCredit workshop
  • Scaling Up Community Management of Rural Water Supply, IRC, March 2004
  • Evaluation of Sustainability and Health Impacts of
  • Evaluating sustainability and health impact of CMP
  • WASH Sector Stakehoder Analysis 2012
  • Abiy Girma: Key Information
  • Arto Suominen, 2012 workshop
  • COWASH woredas
  • Communication strategy 2012
  • Abrham Kebede: Evolving CDF Approach
  • FinnWASH Supply Chain Research
  • Mainstreaming CDF, WB research paper
  • Mulatu Ferede: Supply Chain Research in Amhara
  • COWASH M&E Framework
  • COWASH M&E Framework
  • WaterAid CMP review
  • MoFED-MoWIE Joint Report of CDF
  • COWASH annual report 2006 EFY and plan 2007 EFY
  • COWASH Steering Committee ToR
  • AWP 2007 EFY
  • Abiy Girma. Key Information
  • Arto Suominen: 2012 workshop
  • Elizabeth Were Introduction to WaterCredit -Ethiopia
  • Rahul Bist WaterCredit Market Assessment-Ethiopia Presentation
  • Elizabeth Were Introduction to WaterCredit -Ethiopia
  • Rahul Bist WaterCredit Market Assessment-Ethiopia Presentation
  • Arto Suominen. 2012 workshop
  • Abiy Girma. Key Information
  • Elizabeth Were. WaterCredit
  • Gonji Kolella Case Study Report
  • Gonji Kolella Case Study Report
  • Case Study of Ele Spring
  • IMG_1828
  • IMG_1828
  • Training Impact Research Part 1
  • Training Impact Research Part 2
  • Training Impact Research Part 1
  • Training Impact Research Part 2
  • WASH POM August 15, 2014
  • One WASH POM August 214
  • One WASH POM August 15, 2014
  • TA for COWASH II selected
  • DSC_0069[1]
  • 20140902_105748
  • Winning celebration
  • CB-training
  • feedback_results
  • Winning celebration
  • Water Credit Market Assessment Rport
  • WaterCredit Market Assessment Report, August 2014 by Water.org
  • Participants
  • GLOWS Manual
  • Kebele WSP Guideline
  • Kebele WSP Guideline in Amharic
  • GLOWS Amharic 2014
  • GLOWS 2014 Amharic
  • GLOWS English 2014
  • Kebele WSP Guideline, English
  • Kebele WSP Guideline in Amharic
  • Training Impact Research 2014
  • One WASH POM, September 30, 2014
  • COWASH PD Sep 30, 2013
  • COWASH Annual Report July 2013-June 2014 (2006 EFY)
  • Tigray Region WASH MoU
  • Benishangul Gumuz WASH MoU
  • Dire Dawa Administrative Region WASH MoU
  • SNNPR WASH MoU
  • Oromia WASH MoU
  • COWASH Annual report July 2013-June 2014 (2006 EFY) revised
  • Alana with the Chair W/ro Shennash
  • Visit to Abichu gena woreda
  • Abichu gena woreda
  • The Chair and Treasurer of the Debero-Garmojo scheme
  • Zena, Issue 1, Oct 2014
  • Zena, Issue 1, Oct 2014
  • Zena, Issue 1, Oct 2014
  • National Sanitation Marketing Guideline
  • February 2014 report
  • Primary school WASH design and construction manual
  • School WASH construction and Design Manual
  • CDF evaluation by WSP-Africa on 2010
  • COWASH Case Study, November 2014
  • Sani Mark Zena No 1, Oct 2014
  • 486A1000
  • 486A1000
  • Gender Mainstreaming in Ethiopia by Lakech Haile,Dec 8, 2014
  • IRC News September 2014
  • Finland's Country Strategy for Ethiopia in Development Cooperation 2014-2017
  • RAMBOLL Code of Conduct
  • Self Supply News, Nov 2014
  • WaterAid, Disability in sanitation, Ethiopia case study
  • Plan International, ODF Sustainability, Ethiopia
  • CMP Implementation manual meeting on Dec 17, 2014
  • IMG_1916
  • CMP meeting in COWASH office Dec 17, 2014
  • 486A1689
  • 486A1689
  • CMP Management training in BG
  • CMP Management training in BG
  • 486A1689
  • 486A1689
  • 486A1689
  • 486A1689copy
  • 486A1689
  • 486A1689
  • Oromia
  • 486A2488
  • Yohannes
  • COWASH woredas
  • COWASH_woreda_db 24.2.14_a
  • COWASH-Amhara-A6 v2
  • COWASH Capacity Building Strategy Jan 15, 2015
  • Request for Proposal training impact assessment
  • CMP Training Manuals
  • TOR for the training impact assessment
  • Formats
  • WASHCO training materials general
  • WASHCO Training Materials in PDF
  • CMP Manuals
  • TOR training impact assessment
  • Design of CDF and credit products December 2008
  • Design of CDF and credit products December 2008
  • Amhara Profile Dec 2015
  • Gult-5 Water Point
  • The Steward
  • Yeloma Kebele
  • COWASH profile
  • COWASH profile
  • COWASH quarterly report July 2014-September 2014
  • COWASH Summary Quarterly report July 2014-September 2014
  • COWASH output based quarterly report July 2014-September 2014
  • COWASH Summary quarterly report July 2014-Septembr 2014
  • COWASH Phase I Completion Report June 2011-September 2014
  • Yeloma Kebele
  • Gult-5 Water Point
  • Amhara Profile December 2014
  • COWASH Profile
  • CMP Implementation Guideline for OWNP
  • Contact CMP
Back to top of pageBack to top of page
 This page is printer friendly. Only this column will be printed.

Partners

Ministry of Foreign Affairs of Finland Ministry of Water, Irrigation and Energy of the Federal Republic of Ethiopia Ramboll Finland Oy Niras IRC

Creative Commons Licence
This work by COWASH is licensed under a Creative Commons License.

  • About CMP
  • News
  • Features
  • CMP Regions
  • Resources
  • Suomeksi
  • Partners
  • Q & A